Strategic Energy Management Model in A Cement Plant in Indonesia

Agustinus Hariadidp, C. P. Mahandari
{"title":"Strategic Energy Management Model in A Cement Plant in Indonesia","authors":"Agustinus Hariadidp, C. P. Mahandari","doi":"10.1145/3429789.3429861","DOIUrl":null,"url":null,"abstract":"A cement plant was required to provide consistency of its energy performance through energy system implementation and a third-party certification. However, the plant has not an energy system in place to answer the quick demand apart from routine energy measurement. Energy design and implementation of management system (EDIM) based on ISO 50001: 2018 and the Pearce II and Robinson's strategic management model is then made and implemented to answer the problem. The ISO model contributes much on operational risks whilst the second emphasizes on strategic ones. The study applies qualitative method through interactions with 2 energy experts in strategic and management system and 3 plant staff dealing with energy and management system. Interview, notetaking and written comments are done to get themes of the issues. The investigation results in that the EDIM model has fully met requirements of the ISO 50001 as well as the strategic management model. It has provided adequate implementable framework and easily applied to attain energy performance indicators. Problems, though, are emerged during implementation due to separated strategic actions with operational practices including use of new energy-management terms asking for longer time to be comprehended. In conclusion, consistent energy performance in current business situation can be assured through the model consisting of strategic and operational components.","PeriodicalId":416230,"journal":{"name":"Proceedings of the 2021 International Conference on Engineering and Information Technology for Sustainable Industry","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2021 International Conference on Engineering and Information Technology for Sustainable Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3429789.3429861","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A cement plant was required to provide consistency of its energy performance through energy system implementation and a third-party certification. However, the plant has not an energy system in place to answer the quick demand apart from routine energy measurement. Energy design and implementation of management system (EDIM) based on ISO 50001: 2018 and the Pearce II and Robinson's strategic management model is then made and implemented to answer the problem. The ISO model contributes much on operational risks whilst the second emphasizes on strategic ones. The study applies qualitative method through interactions with 2 energy experts in strategic and management system and 3 plant staff dealing with energy and management system. Interview, notetaking and written comments are done to get themes of the issues. The investigation results in that the EDIM model has fully met requirements of the ISO 50001 as well as the strategic management model. It has provided adequate implementable framework and easily applied to attain energy performance indicators. Problems, though, are emerged during implementation due to separated strategic actions with operational practices including use of new energy-management terms asking for longer time to be comprehended. In conclusion, consistent energy performance in current business situation can be assured through the model consisting of strategic and operational components.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
印尼某水泥厂战略能源管理模式
要求水泥厂通过能源系统实施和第三方认证提供其能源绩效的一致性。然而,除了常规的能源测量外,该工厂还没有一个能源系统来满足快速的需求。然后根据ISO 50001: 2018和Pearce II和Robinson的战略管理模型制定并实施能源设计和实施管理系统(EDIM)来回答这个问题。ISO模型对操作风险贡献很大,而第二个模型则强调战略风险。本研究采用定性方法,通过与2名能源战略与管理系统专家和3名工厂能源与管理系统工作人员的互动。通过采访、记笔记和书面评论来了解问题的主题。调查结果表明,EDIM模式完全符合ISO 50001和战略管理模式的要求。它为实现能源绩效指标提供了充分的可执行框架和易于应用。然而,由于战略行动与业务实践分开,包括使用需要较长时间才能理解的新能源管理术语,在执行过程中出现了问题。综上所述,通过由战略和运营组件组成的模型,可以确保当前业务状况下一致的能源绩效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Simple Vertical Axis Wind Turbine for Low Wind Speed Gain Optimization for Cutting Tests on CNC Machine Using the Ballbar Method with CMM Machine Measurements Strategic Energy Management Model in A Cement Plant in Indonesia Study on The Potential Application of Water Hyacinth as An Organic Corrosion Inhibitor Safety Riding Behavior Tendency among College Students Related to Driving Attitude, Riding Knowledge, and Emotional Intelligence Level
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1