Operational Tests of a Modular Installation and Transport Assembly of Steel Arch Support in Underground Excavations

K. Krauze, K. Mucha, T. Wydro, Andrzej Kutnik, Waldemar Hałas, Piotr Ruda, Dawid Osowski
{"title":"Operational Tests of a Modular Installation and Transport Assembly of Steel Arch Support in Underground Excavations","authors":"K. Krauze, K. Mucha, T. Wydro, Andrzej Kutnik, Waldemar Hałas, Piotr Ruda, Dawid Osowski","doi":"10.2478/mape-2021-0031","DOIUrl":null,"url":null,"abstract":"Abstract The roof support, especially the ŁP yielding steel arch support, is transported and assembled in the face with the use of auxiliary machines. This activity in Polish underground mines causes numerous problems, which until present have not been solved. Currently, transport and assembly are carried out manually, while the roadheader and suspended rail are used only to a small extent. Therefore, the modular installation and transport assembly was developed jointly by FAMA Sp. z o. o. and AGH University of Science and Technology. The solution in question enables performing a number of functions (including transport and assembly of all kinds of support arches), which are not available in currently manufactured equipment. The proposed manipulator solves numerous problems occurring during the installation of the steel arch support in an underground mining excavation and significantly improves the process of drilling galleries. This innovative solution considerably differs from the existing ones, and its greatest advantage is versatility with regard to the cross-section and equipment of the roadway, as well as a wide range of functions. In addition, it can also be used for reloading works. The modular installation and transport assembly together with a platform, a temporary mechanized roof support and a mining machine, make up a mechanizes roadheader complex, which enables continuous mining, loading and installing the permanent support in underground workings.","PeriodicalId":281768,"journal":{"name":"Multidisciplinary Aspects of Production Engineering","volume":"496 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Multidisciplinary Aspects of Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/mape-2021-0031","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Abstract The roof support, especially the ŁP yielding steel arch support, is transported and assembled in the face with the use of auxiliary machines. This activity in Polish underground mines causes numerous problems, which until present have not been solved. Currently, transport and assembly are carried out manually, while the roadheader and suspended rail are used only to a small extent. Therefore, the modular installation and transport assembly was developed jointly by FAMA Sp. z o. o. and AGH University of Science and Technology. The solution in question enables performing a number of functions (including transport and assembly of all kinds of support arches), which are not available in currently manufactured equipment. The proposed manipulator solves numerous problems occurring during the installation of the steel arch support in an underground mining excavation and significantly improves the process of drilling galleries. This innovative solution considerably differs from the existing ones, and its greatest advantage is versatility with regard to the cross-section and equipment of the roadway, as well as a wide range of functions. In addition, it can also be used for reloading works. The modular installation and transport assembly together with a platform, a temporary mechanized roof support and a mining machine, make up a mechanizes roadheader complex, which enables continuous mining, loading and installing the permanent support in underground workings.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
地下基坑钢拱支撑模块化安装运输总成运行试验
摘要顶板支架,特别是ŁP屈服钢拱支架,是利用辅机在工作面进行运输和拼装的。波兰地下矿山的这种活动造成了许多问题,这些问题到目前为止还没有解决。目前,运输和装配都是手工进行的,掘进机和悬挂轨道的使用范围很小。因此,模块化安装和运输组件由FAMA Sp. z . o. o.和AGH科技大学共同开发。所讨论的解决方案能够执行许多功能(包括各种支撑拱的运输和组装),这些功能在当前制造的设备中是不可用的。该机械手解决了地下矿山开挖钢拱支架安装过程中出现的诸多问题,显著提高了巷道的钻进工艺。这种创新的解决方案与现有的解决方案有很大的不同,其最大的优点是在巷道的横截面和设备方面的通用性,以及广泛的功能。此外,它还可以用于重新加载作品。模块化安装和运输组件与平台、临时机械化顶板支架和采矿机一起组成机械化掘进机综合体,可在井下连续开采、装载和安装永久支架。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Visual Monitoring as a Tool in Industrial Security Engineering. Case Study Using MCDM Methods to Assess the Extent to which the European Union Countries Use Renewable Energy The Way of Improvement of Quality of Life of Older Persons as Users and Maintainers of Technical Means Operational Tests of a Modular Installation and Transport Assembly of Steel Arch Support in Underground Excavations Statistical and Econometric Analysis of Selected Effects of COVID-19 Pandemic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1