Analysis on the Influencing Factors and Countermeasures of Management of Prefabricated Construction Project

Ling Liu, Tian Tian
{"title":"Analysis on the Influencing Factors and Countermeasures of Management of Prefabricated Construction Project","authors":"Ling Liu, Tian Tian","doi":"10.38007/proceedings.0000207","DOIUrl":null,"url":null,"abstract":"The development trend of the construction industry in China is rapid, and it is important to conduct research on it. The relatively new prefabricated construction project in the construction industry is a work with controllable cost, short construction period and low energy consumption. However, the construction of prefabricated building projects is relatively more complicated, and it will involve hoisting procedures, and the hidden safety risks are greater. The author introduces the prefabricated building briefly, then analyzes the main influencing factors in the management of prefabricated building engineering, and finally formulates the corresponding countermeasures for the influencing factors of management of prefabricated building engineering.","PeriodicalId":202744,"journal":{"name":"2020 International Conference on Social and Human Sciences (ICSHS2020)","volume":"162 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Social and Human Sciences (ICSHS2020)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38007/proceedings.0000207","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The development trend of the construction industry in China is rapid, and it is important to conduct research on it. The relatively new prefabricated construction project in the construction industry is a work with controllable cost, short construction period and low energy consumption. However, the construction of prefabricated building projects is relatively more complicated, and it will involve hoisting procedures, and the hidden safety risks are greater. The author introduces the prefabricated building briefly, then analyzes the main influencing factors in the management of prefabricated building engineering, and finally formulates the corresponding countermeasures for the influencing factors of management of prefabricated building engineering.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
装配式建筑项目管理的影响因素及对策分析
中国建筑业发展趋势迅猛,对其进行研究具有重要意义。装配式建筑项目是建筑业中相对较新的工程,是一项造价可控、工期短、能耗低的工程。但装配式建筑工程施工相对较为复杂,且会涉及吊装程序,安全隐患较大。简要介绍了装配式建筑,分析了装配式建筑工程管理中的主要影响因素,最后针对装配式建筑工程管理的影响因素制定了相应的对策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Innovation in New Energy Vehicles-Take NIO as an Example Obstacles to China's Low-carbon Economy A Study of The Reaction and Performance of Elite Athletes An Analysis of Financial Flexibility and Over Investment from the Perspective of Corporate Governance Research on Labor Law Transformation in the Age of Artificial Intelligence
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1