{"title":"Evaluasi Keandalan PLTA Bakaru","authors":"Akbar Tanjung, Arman Jaya, Suryanto Suryanto, Apollo Apollo","doi":"10.31963/SINERGI.V19I1.2762","DOIUrl":null,"url":null,"abstract":"One form of water energy utilization is done by building a Hydroelectric Power Plant (PLTA) in Indonesia, the Bakaru PLTA is one of the projects within PT. PLN (Persero). This project is a Hydro Power Plant Master project with a SULSELRABAR transmission located 246 km from the city of Makassar. The operation of the Bakaru hydropower system is certainly expected to work optimally, reliably and efficiently. Therefore, evaluation or data on the performance of the generator itself is needed. This study was conducted to determine the condition of the Bakaru hydropower plant based on the equivalent availability factor (EAF) and Net Capacity Factor (NCF) and Cost of Production (BPP). The data used is operating data on the Bakaru hydropower plant for 1 year. The data was obtained by using the documentation technique, while the data analysis was carried out using the Microsoft Excel program. After conducting research, it can be concluded that the condition of the Bakaru hydropower plant in 2017 is considered normal, seen from the EAF value reaching 94.15% and the average EFOR value of 2.4% with the number of Service Hours (SH) of 16,912.93 hours from 2 units. with the percentage of Service Hours to Period Hours reaching 96.53%. Meanwhile, the Net Capacity Factor of the Bakaru hydropower plant in 2017 reached 85.83%, with a total gross energy production of 945,372.50 MWh. This value exceeds the target that has been set.","PeriodicalId":315673,"journal":{"name":"Jurnal Teknik Mesin Sinergi","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Mesin Sinergi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31963/SINERGI.V19I1.2762","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

One form of water energy utilization is done by building a Hydroelectric Power Plant (PLTA) in Indonesia, the Bakaru PLTA is one of the projects within PT. PLN (Persero). This project is a Hydro Power Plant Master project with a SULSELRABAR transmission located 246 km from the city of Makassar. The operation of the Bakaru hydropower system is certainly expected to work optimally, reliably and efficiently. Therefore, evaluation or data on the performance of the generator itself is needed. This study was conducted to determine the condition of the Bakaru hydropower plant based on the equivalent availability factor (EAF) and Net Capacity Factor (NCF) and Cost of Production (BPP). The data used is operating data on the Bakaru hydropower plant for 1 year. The data was obtained by using the documentation technique, while the data analysis was carried out using the Microsoft Excel program. After conducting research, it can be concluded that the condition of the Bakaru hydropower plant in 2017 is considered normal, seen from the EAF value reaching 94.15% and the average EFOR value of 2.4% with the number of Service Hours (SH) of 16,912.93 hours from 2 units. with the percentage of Service Hours to Period Hours reaching 96.53%. Meanwhile, the Net Capacity Factor of the Bakaru hydropower plant in 2017 reached 85.83%, with a total gross energy production of 945,372.50 MWh. This value exceeds the target that has been set.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
巴丸先生的可靠性评估
一种形式的水能利用是通过在印度尼西亚建造水力发电厂(PLTA)来完成的,巴卡鲁水电站是PT. PLN (Persero)的项目之一。该项目是一个水力发电厂主项目,SULSELRABAR输电线位于距望加锡市246公里处。巴卡鲁水电系统的运行无疑有望达到最佳、可靠和高效。因此,需要对发电机本身的性能进行评价或数据。本研究基于等效可用系数(EAF)、净容量系数(NCF)和生产成本(BPP)来确定巴卡鲁水电站的状态。所使用的数据是巴卡鲁水电站1年的运行数据。采用文献技术获取数据,使用Microsoft Excel程序进行数据分析。经研究,巴卡鲁水电站2017年运行状况正常,2台机组的EAF值为94.15%,平均EFOR值为2.4%,运行时数(SH)为16,912.93小时。服务时间占周期时间的比例达到96.53%。同时,巴卡鲁水电站2017年的净容量系数达到85.83%,总发电量为945372.50兆瓦时。此值超出已设置的目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pengaruh Variasi Arus Listrik pada Pengelasan SMAW Material Stainless Steel 304 dengan Elektroda E308 terhadap Kekuatan Mekanik dan Struktur Mikro Prototipe Sistem Gate Otomatis pada Bendungan PLTA Analisis Getaran dan Kebisingan Terhadap Rasio Kompresi Pada Mesin Bensin TV1 Studi Tinjauan Perencanaan Sistem Plumbing Air Bersih (Studi Kasus: Gedung Sekolah Tinggi Ilmu Bahasa Arab) Analisis Pengaruh Diameter Sudu Pipa Elbow Terhadap Kinerja Turbin
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1