Prototipe Sistem Gate Otomatis pada Bendungan PLTA

S. Abadi, Yiyin Klistafani, Sitti Nurlatifa, Jeri Christanto
{"title":"Prototipe Sistem Gate Otomatis pada Bendungan PLTA","authors":"S. Abadi, Yiyin Klistafani, Sitti Nurlatifa, Jeri Christanto","doi":"10.31963/sinergi.v21i1.4175","DOIUrl":null,"url":null,"abstract":"This study aims to make a prototype mechanism for opening and closing the gate on a hydropower dam using the Arduino Uno microcontroller. The research was conducted by making two gates (gate-1 and gate-2) which will open or close based on the water level of the dam. Gate-1 and gate-2 will close if the water level of the dam does not exceed the limit for immediate reduction. The test was carried out with variations in the conditions of water entering the dam, namely calm water conditions, heavy water conditions, and low water conditions. From the tests carried out, it was found that gate-1 always opens when the water level reaches 8 cm or more, while gate-2 opens when the water level starts to reach 11 cm. The length of time gate-1 and gate-2 open according to the water level of the dam.","PeriodicalId":315673,"journal":{"name":"Jurnal Teknik Mesin Sinergi","volume":"107 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Mesin Sinergi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31963/sinergi.v21i1.4175","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to make a prototype mechanism for opening and closing the gate on a hydropower dam using the Arduino Uno microcontroller. The research was conducted by making two gates (gate-1 and gate-2) which will open or close based on the water level of the dam. Gate-1 and gate-2 will close if the water level of the dam does not exceed the limit for immediate reduction. The test was carried out with variations in the conditions of water entering the dam, namely calm water conditions, heavy water conditions, and low water conditions. From the tests carried out, it was found that gate-1 always opens when the water level reaches 8 cm or more, while gate-2 opens when the water level starts to reach 11 cm. The length of time gate-1 and gate-2 open according to the water level of the dam.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PLTA大坝的自动门系统原型
本研究旨在利用Arduino Uno微控制器制作水电大坝闸门开启和关闭的原型机构。研究人员制作了两个闸门(闸门1号和闸门2号),根据大坝的水位打开或关闭。如果大坝水位不超过立即降低的限制,闸门1和闸门2将关闭。试验是在不同的入坝水条件下进行的,即静水条件、重水条件和低水条件。通过试验发现,当水位达到8cm以上时,闸门1总是打开,而当水位开始达到11cm时,闸门2总是打开。闸门1和闸门2的开启时间长短根据大坝水位而定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Pengaruh Variasi Arus Listrik pada Pengelasan SMAW Material Stainless Steel 304 dengan Elektroda E308 terhadap Kekuatan Mekanik dan Struktur Mikro Prototipe Sistem Gate Otomatis pada Bendungan PLTA Analisis Getaran dan Kebisingan Terhadap Rasio Kompresi Pada Mesin Bensin TV1 Studi Tinjauan Perencanaan Sistem Plumbing Air Bersih (Studi Kasus: Gedung Sekolah Tinggi Ilmu Bahasa Arab) Analisis Pengaruh Diameter Sudu Pipa Elbow Terhadap Kinerja Turbin
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1