Artificial Intelligence in Construction Management – a Perspective

W. Eber
{"title":"Artificial Intelligence in Construction Management – a Perspective","authors":"W. Eber","doi":"10.3311/ccc2019-030","DOIUrl":null,"url":null,"abstract":"Efficient organization of construction services seems to be a complex task, limited by the capabilities of human intelligence. During the seventies based on e.g. the development of fuzzy technologies by Zadeh, the rise of expert systems gave new hope to innovative approaches to solving complex situations in project management. As history teaches, since then no real advance could be observed regarding this concept. Nowadays construction and real estate projects have become larger, thus more complex and risky, time schedules have become tighter as have the available budgets. With this the need of support of the organizational challenge has increased significantly. In this context and supported by the presently available computing power as well as on the basis of a presumably complete model of the building including the construction process with an Building Information Model (BIM), the idea of support by Artificial Intelligence has gained importance again and new hopes as well as fears have come to life. Prior to explicit attempts to construct tools for construction management, an investigation of the principal needs of organizational support as well as the possibilities provided by Artificial Intelligence is required in order to prepare the ground for future development. In this paper the principle understanding of complexity based on locality developing into emergent behaviour of the organization of construction projects is presented and mirrored to the expectance towards artificial intelligence operating on a Building Information Model (BIM). This investigation makes use of the theory of systems to model the behaviour of complex systems as well as of commonly used approaches offered by artificial intelligence concepts, e.g. neuronal networks, machine learning algorithms and rule-based decisions within a complex context. On this background the feasibility of improvement in gaining efficiency in construction management organization is elaborated and reviewed. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Efficient organization of construction services seems to be a complex task, limited by the capabilities of human intelligence. During the seventies based on e.g. the development of fuzzy technologies by Zadeh, the rise of expert systems gave new hope to innovative approaches to solving complex situations in project management. As history teaches, since then no real advance could be observed regarding this concept. Nowadays construction and real estate projects have become larger, thus more complex and risky, time schedules have become tighter as have the available budgets. With this the need of support of the organizational challenge has increased significantly. In this context and supported by the presently available computing power as well as on the basis of a presumably complete model of the building including the construction process with an Building Information Model (BIM), the idea of support by Artificial Intelligence has gained importance again and new hopes as well as fears have come to life. Prior to explicit attempts to construct tools for construction management, an investigation of the principal needs of organizational support as well as the possibilities provided by Artificial Intelligence is required in order to prepare the ground for future development. In this paper the principle understanding of complexity based on locality developing into emergent behaviour of the organization of construction projects is presented and mirrored to the expectance towards artificial intelligence operating on a Building Information Model (BIM). This investigation makes use of the theory of systems to model the behaviour of complex systems as well as of commonly used approaches offered by artificial intelligence concepts, e.g. neuronal networks, machine learning algorithms and rule-based decisions within a complex context. On this background the feasibility of improvement in gaining efficiency in construction management organization is elaborated and reviewed. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
人工智能在施工管理中的应用
有效地组织建筑服务似乎是一项复杂的任务,受到人类智力能力的限制。在70年代,基于Zadeh的模糊技术的发展,专家系统的兴起给解决项目管理中复杂情况的创新方法带来了新的希望。历史告诉我们,从那时起,这个概念就没有真正的进步。如今,建筑和房地产项目变得更大,因此更复杂和风险,时间安排变得更紧,可用的预算也更紧。因此,支持组织挑战的需要大大增加了。在这种背景下,在现有计算能力的支持下,以及在一个可能完整的建筑模型的基础上,包括建筑信息模型(BIM)的施工过程,人工智能支持的想法再次变得重要起来,新的希望和恐惧已经成为现实。在明确尝试构建施工管理工具之前,需要对组织支持的主要需求以及人工智能提供的可能性进行调查,以便为未来的发展做好准备。本文提出了基于局部性的复杂性的基本理解,并将其发展为建筑项目组织的紧急行为,并反映了对在建筑信息模型(BIM)上运行的人工智能的期望。本研究利用系统理论来模拟复杂系统的行为,以及人工智能概念提供的常用方法,例如神经网络,机器学习算法和复杂环境中的基于规则的决策。在此背景下,论述了提高施工管理组织效率的可行性。©2019作者。由布达佩斯科技经济大学和钻石大会有限公司出版。由2019创意建设大会科学委员会负责同行评审。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Input for Hybrid Simulation Modelling Construction Operations What are the Barriers and Drivers Toward BIM Adoption in Nigeria? Ontology Assisted Collaboration Sessions on 4D BIM A Balanced Scorecard for Assessing Automation in Construction Traceability for Built Assets: Proposed Framework for a Digital Record
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1