{"title":"Applying the Value/Petri process to ERP software development in China","authors":"LiGuo Huang, B. Boehm, Hao Hu, Jidong Ge, Jian Lü, Cheng Qian","doi":"10.1145/1134285.1134356","DOIUrl":null,"url":null,"abstract":"Commercial organizations increasingly need software processes sensitive to business value, quick to apply, and capable of early analysis for subprocess consistency and compatibility. This paper presents experience in applying a lightweight synthesis of a Value-Based Software Quality Achievement (VBSQA) process and an Object-Petri-Net-based process model (called VBSQA-OPN) to achieve a manager-satisfactory process for software quality achievement in an on-going ERP software project in China. The results confirmed that 1) the application of value-based approaches was inherently better than value-neutral approaches adopted by most ERP software projects; 2) the VBSQA-OPN model provided project managers with a synchronization and stabilization framework for process activities, success-critical stakeholders and their value propositions; 3) process visualization and simulation tools significantly increased management visibility and controllability for the success of software project.","PeriodicalId":246572,"journal":{"name":"Proceedings of the 28th international conference on Software engineering","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 28th international conference on Software engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1134285.1134356","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14
Abstract
Commercial organizations increasingly need software processes sensitive to business value, quick to apply, and capable of early analysis for subprocess consistency and compatibility. This paper presents experience in applying a lightweight synthesis of a Value-Based Software Quality Achievement (VBSQA) process and an Object-Petri-Net-based process model (called VBSQA-OPN) to achieve a manager-satisfactory process for software quality achievement in an on-going ERP software project in China. The results confirmed that 1) the application of value-based approaches was inherently better than value-neutral approaches adopted by most ERP software projects; 2) the VBSQA-OPN model provided project managers with a synchronization and stabilization framework for process activities, success-critical stakeholders and their value propositions; 3) process visualization and simulation tools significantly increased management visibility and controllability for the success of software project.