Planning Training

Sheila Burton
{"title":"Planning Training","authors":"Sheila Burton","doi":"10.14217/9781848598935-9-en","DOIUrl":null,"url":null,"abstract":"The purpose of a Training Plan is to identify the work to be carried out to achieve agreed objectives. Training Plans should be drawn up to identify long term (4 years) objectives as well as short term plans for the forth coming season. For the rest of this topic I will concentrate on the development of the short term annual Training Plan. In its simplest form the plan could comprise of a single, A4 sheet identifying the overall plan for the year, and more detailed weekly plans identifying the specific activities the athlete is to carry out.","PeriodicalId":125299,"journal":{"name":"The ELSA Trainers’ Manual","volume":"565 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The ELSA Trainers’ Manual","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14217/9781848598935-9-en","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The purpose of a Training Plan is to identify the work to be carried out to achieve agreed objectives. Training Plans should be drawn up to identify long term (4 years) objectives as well as short term plans for the forth coming season. For the rest of this topic I will concentrate on the development of the short term annual Training Plan. In its simplest form the plan could comprise of a single, A4 sheet identifying the overall plan for the year, and more detailed weekly plans identifying the specific activities the athlete is to carry out.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
计划培训
培训计划的目的是确定为实现商定目标所要开展的工作。训练计划的制定应确定长期(4年)目标以及下个赛季的短期计划。对于这个话题的其余部分,我将集中精力制定短期年度培训计划。该计划最简单的形式可以包括一张A4纸,上面列出了全年的总体计划,以及更详细的每周计划,列出了运动员要进行的具体活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Supplementary Training Planning Training Day 1 Day 2 Planning the Introduction of the ELSA Project Within a Local Authority
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1