Power calculations and grounding in EDP/UPS power networks

H. Pettersson, I. Pohjonen
{"title":"Power calculations and grounding in EDP/UPS power networks","authors":"H. Pettersson, I. Pohjonen","doi":"10.1109/INTLEC.1988.22397","DOIUrl":null,"url":null,"abstract":"It is noted that, as a load, a computer system presents the designer with difficult task in terms of electrical feed dimensioning, especially in the TN-S and TN-C-S 3*230/400 V, 50 or 60 Hz network configurations. This extremely nonlinear load and its high in-rush currents and neutral wire current imposes extra requirements on the distribution network, its grounding, and UPS (uninterruptible power system) powering. The authors present guidelines for calculating crest factors, fundamental factors, and power factors for single and three-phase nonlinear loads or combinations of these two. It is concluded that the guidelines have shown their necessity as an instrument assuring the cooperation between users, EDP (electronic data processing) equipment suppliers, UPS suppliers, and electrical network designers to achieve the right solutions and results.<<ETX>>","PeriodicalId":169486,"journal":{"name":"10th International Telecommunications Energy Conference","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"10th International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1988.22397","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

It is noted that, as a load, a computer system presents the designer with difficult task in terms of electrical feed dimensioning, especially in the TN-S and TN-C-S 3*230/400 V, 50 or 60 Hz network configurations. This extremely nonlinear load and its high in-rush currents and neutral wire current imposes extra requirements on the distribution network, its grounding, and UPS (uninterruptible power system) powering. The authors present guidelines for calculating crest factors, fundamental factors, and power factors for single and three-phase nonlinear loads or combinations of these two. It is concluded that the guidelines have shown their necessity as an instrument assuring the cooperation between users, EDP (electronic data processing) equipment suppliers, UPS suppliers, and electrical network designers to achieve the right solutions and results.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
EDP/UPS电网的功率计算和接地
值得注意的是,作为负载,计算机系统在馈电尺寸方面给设计人员带来了困难的任务,特别是在TN-S和TN-C-S 3*230/400 V, 50或60 Hz网络配置中。这种极其非线性的负载及其高涌流和中性线电流对配电网、接地和不间断电源系统(UPS)供电提出了额外的要求。作者提出了计算峰值因素,基本因素和功率因素的指导方针,为单相和三相非线性负载或这两者的组合。结论是,该指南已经显示了其作为确保用户、EDP(电子数据处理)设备供应商、UPS供应商和电网设计师之间合作的工具的必要性,以实现正确的解决方案和结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Conversion of constant current to constant voltage by high-frequency resonant converter Design for a highly efficient distributed power supply system based on reliability analysis Redundant DC-DC switching power supply system for telecommunication equipment The quality required in electrolyte limited, valve regulated lead-acid batteries for telecommunication systems Spectral analysis of input currents of delta PWM converters using discrete Fourier transform
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1