{"title":"Method for enumerating feasible LDC parameters for OLTC and SVR in distribution networks","authors":"Shunsuke Kawano, S. Yoshizawa, Y. Hayashi","doi":"10.1109/IGBSG.2016.7539449","DOIUrl":null,"url":null,"abstract":"This paper presents a method for enumerating the feasible load drop compensator (LDC) parameters of on-load tap changer (OLTC) and step voltage regulators (SVRs) in distribution networks utilizing data acquired by SCADA. Deriving the feasible combinations of LDC parameters is becoming important because voltage control is becoming difficult due to the introduction of photovoltaic generation systems, and the voltage control effectiveness of OLTC and SVRs depends on their three LDC parameters: the target voltage, the dead-band, and the impedance. However, an exhaustive search takes a lot of time and heuristics or metaheuristics provide no guarantee on the quality of the solution. The proposed method derives all the feasible LDC parameters, with which tap operation keeping voltage within the proper range is performed, within practical time. To evaluate the performance of the proposed method, the numerical simulation results of the proposed method will be compared with those of the metaheuristics.","PeriodicalId":348843,"journal":{"name":"2016 2nd International Conference on Intelligent Green Building and Smart Grid (IGBSG)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 2nd International Conference on Intelligent Green Building and Smart Grid (IGBSG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IGBSG.2016.7539449","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper presents a method for enumerating the feasible load drop compensator (LDC) parameters of on-load tap changer (OLTC) and step voltage regulators (SVRs) in distribution networks utilizing data acquired by SCADA. Deriving the feasible combinations of LDC parameters is becoming important because voltage control is becoming difficult due to the introduction of photovoltaic generation systems, and the voltage control effectiveness of OLTC and SVRs depends on their three LDC parameters: the target voltage, the dead-band, and the impedance. However, an exhaustive search takes a lot of time and heuristics or metaheuristics provide no guarantee on the quality of the solution. The proposed method derives all the feasible LDC parameters, with which tap operation keeping voltage within the proper range is performed, within practical time. To evaluate the performance of the proposed method, the numerical simulation results of the proposed method will be compared with those of the metaheuristics.