The testing workstation: a universal testing framework for Hydro-Quebec's new SCADA/EMS

S. Clermont, R. Boule, L. Brouillette, P. Poulin
{"title":"The testing workstation: a universal testing framework for Hydro-Quebec's new SCADA/EMS","authors":"S. Clermont, R. Boule, L. Brouillette, P. Poulin","doi":"10.1109/PICA.1995.515205","DOIUrl":null,"url":null,"abstract":"Hydro-Quebec is in the process of renewing its energy management system (EMS) and its SCADA. Part of this work involves the introduction of a new data acquisition architecture. The proposed architecture requires that many systems now in operation be modified. This article describes a specialized testing workstation (TW) which provides all the testing capabilities needed to validate the full operation of the systems in the new communications environment. These include RTUs, other acquisition systems and even the new SCADA/EMS itself. The TW offers an extensive set of tools: communications analyzer, application data monitor, automatic and script-based simulators, allowing full testing of any system using the communications protocol of the new SCADA/EMS. The testing can be either at the communications level or at the application level. Since the TW has full database capabilities for field data, it can act both as a client (SCADA) and as a server (e.g. RTU). For Hydro-Quebec, the TW offers the advantage of standardizing the testing process used during the development of the new systems. The use of universal test equipment facilitates the integration of all systems into the new SCADA/EMS environment.","PeriodicalId":294493,"journal":{"name":"Proceedings of Power Industry Computer Applications Conference","volume":"88 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Power Industry Computer Applications Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1995.515205","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Hydro-Quebec is in the process of renewing its energy management system (EMS) and its SCADA. Part of this work involves the introduction of a new data acquisition architecture. The proposed architecture requires that many systems now in operation be modified. This article describes a specialized testing workstation (TW) which provides all the testing capabilities needed to validate the full operation of the systems in the new communications environment. These include RTUs, other acquisition systems and even the new SCADA/EMS itself. The TW offers an extensive set of tools: communications analyzer, application data monitor, automatic and script-based simulators, allowing full testing of any system using the communications protocol of the new SCADA/EMS. The testing can be either at the communications level or at the application level. Since the TW has full database capabilities for field data, it can act both as a client (SCADA) and as a server (e.g. RTU). For Hydro-Quebec, the TW offers the advantage of standardizing the testing process used during the development of the new systems. The use of universal test equipment facilitates the integration of all systems into the new SCADA/EMS environment.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
测试工作站:魁北克水电公司新型SCADA/EMS的通用测试框架
魁北克水电公司正在更新其能源管理系统(EMS)和SCADA。这项工作的一部分涉及引入一种新的数据采集体系结构。所提出的体系结构要求对目前运行的许多系统进行修改。本文描述了一个专门的测试工作站(TW),它提供了在新的通信环境中验证系统的完整操作所需的所有测试功能。这些包括rtu,其他采集系统,甚至新的SCADA/EMS本身。TW提供了一套广泛的工具:通信分析仪,应用数据监视器,自动和基于脚本的模拟器,允许使用新的SCADA/EMS的通信协议对任何系统进行全面测试。测试可以在通信级别,也可以在应用程序级别。由于TW具有完整的现场数据数据库功能,它既可以作为客户端(SCADA),也可以作为服务器(例如RTU)。对于Hydro-Quebec来说,TW在新系统开发过程中提供了标准化测试过程的优势。通用测试设备的使用有助于将所有系统集成到新的SCADA/EMS环境中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Development of the Intercontrol Center Communications Protocol (ICCP) [power system control] Hydropower generation management under uncertainty via scenario analysis and parallel computation Optimal fuzzy inference for short-term load forecasting Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method The design of next generation SCADA systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1