{"title":"Integration method analysis between IEC 61850 and IEC 61970 for substation automation system","authors":"J. Choi, Hak Jang, Sungho Kim","doi":"10.1109/TD-ASIA.2009.5356844","DOIUrl":null,"url":null,"abstract":"Both IEC 61850 [1] and IEC 61970 [2] define the access mechanism to the substation electric utility's data and data architecture. But they use a different approach in the access mechanism. IEC 61850 is defined from the internal communication standpoint whereas IEC 61970 is from the substation management standpoint. Thus, harmonization [3] is required to integrate both sides. In this paper, we'll discuss about harmonization methodology and its derivative problems and finally about the direction research should take.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356844","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

Both IEC 61850 [1] and IEC 61970 [2] define the access mechanism to the substation electric utility's data and data architecture. But they use a different approach in the access mechanism. IEC 61850 is defined from the internal communication standpoint whereas IEC 61970 is from the substation management standpoint. Thus, harmonization [3] is required to integrate both sides. In this paper, we'll discuss about harmonization methodology and its derivative problems and finally about the direction research should take.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
变电站自动化系统IEC 61850与IEC 61970集成方法分析
IEC 61850[1]和IEC 61970[2]都定义了变电站电力公用事业数据和数据体系结构的访问机制。但是它们在访问机制中使用了不同的方法。IEC 61850是从内部通信的角度定义的,而IEC 61970是从变电站管理的角度定义的。因此,需要协调[3]来整合双方。本文讨论了协调方法及其衍生问题,并提出了今后研究的方向。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operational analysis of DC micro-grid using detailed model of distributed generation Real time digital simulator based test system for microgrid management system Case study of customer baseline(CBL) load determination in Korea based on statistical method Assessment of Conditional Value at Risk (CVaR) in transmission investment using Cross Entropy method Governor-response power flow (GRPF) based long-term voltage stability simulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1