Modeling MW-dependent ramp rate in the electricity market

Haili Song, T. Zheng, Hongrui Liu, Hui Zhang
{"title":"Modeling MW-dependent ramp rate in the electricity market","authors":"Haili Song, T. Zheng, Hongrui Liu, Hui Zhang","doi":"10.1109/PESGM.2014.6939879","DOIUrl":null,"url":null,"abstract":"Maintaining certain amount of reserves in the realtime electricity market is an important task to ensure the reliability of the grid operation. The traditional reserve designation method calculates the reserve capability of a resource based on its average ramp rate, which may misrepresent the true reserve capacity of the system. System reliability and economics could be affected by such misrepresentation under certain conditions. This paper proposes an efficient MW-dependent ramp rate reserve model that utilizes the ramp rate of a generator at its energy desired dispatch point (DDP) in calculating reserve, which accurately reflects the true reserve capacity of the system in real time. The proposed model is prototyped in ISO New England's real time market and the solution is demonstrated to be more accurate and efficient, thus improving the market operation's efficiency and reliability.","PeriodicalId":149134,"journal":{"name":"2014 IEEE PES General Meeting | Conference & Exposition","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE PES General Meeting | Conference & Exposition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESGM.2014.6939879","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

Maintaining certain amount of reserves in the realtime electricity market is an important task to ensure the reliability of the grid operation. The traditional reserve designation method calculates the reserve capability of a resource based on its average ramp rate, which may misrepresent the true reserve capacity of the system. System reliability and economics could be affected by such misrepresentation under certain conditions. This paper proposes an efficient MW-dependent ramp rate reserve model that utilizes the ramp rate of a generator at its energy desired dispatch point (DDP) in calculating reserve, which accurately reflects the true reserve capacity of the system in real time. The proposed model is prototyped in ISO New England's real time market and the solution is demonstrated to be more accurate and efficient, thus improving the market operation's efficiency and reliability.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
电力市场中与兆瓦相关的斜坡率建模
在实时电力市场中保持一定的储备是保证电网运行可靠性的重要任务。传统的储备指定方法是根据资源的平均斜坡率来计算资源的储备能力,这可能会歪曲系统的真实储备能力。在某些条件下,系统可靠性和经济性可能会受到这种虚假陈述的影响。本文提出了一种有效的基于兆瓦的斜坡率备用模型,该模型利用发电机在其能量期望调度点(DDP)的斜坡率计算备用,能实时准确地反映系统的真实备用容量。以ISO新英格兰实时市场为例,验证了该模型的准确性和有效性,提高了市场运行的效率和可靠性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Solution quality analysis on predictive economic dispatch with time Electric generators for biomass waste to energy systems Speed up of data-driven state estimation using low-complexity indexing method Cascadings in large power systems: Benchmarking static vs. time domain simulation Real-time energy management strategies for microgrids
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1