World's Longest DTS Cable Run for Permanent Monitoring Below ESP - A Successful Solution for West Siberian Wells Surveillance with ESP Systems - Case Study
N. Nifontov, A. Maltsev, N. Vikulin, P. Ten, Nikolay Torsunov
{"title":"World's Longest DTS Cable Run for Permanent Monitoring Below ESP - A Successful Solution for West Siberian Wells Surveillance with ESP Systems - Case Study","authors":"N. Nifontov, A. Maltsev, N. Vikulin, P. Ten, Nikolay Torsunov","doi":"10.2118/212094-ms","DOIUrl":null,"url":null,"abstract":"\n This article describes evolution of well design concept for Vikulovskaya oil rim reservoir development with no possibility for fracking and first World's longest application of permanent monitoring solution for appraisal multilateral well with the access to the wellbore restricted by presence of ESP pump in West Siberia inside 7″ casing and 4.5″ production liner Horizontal Multilateral well.","PeriodicalId":394241,"journal":{"name":"Day 1 Tue, November 15, 2022","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, November 15, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/212094-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This article describes evolution of well design concept for Vikulovskaya oil rim reservoir development with no possibility for fracking and first World's longest application of permanent monitoring solution for appraisal multilateral well with the access to the wellbore restricted by presence of ESP pump in West Siberia inside 7″ casing and 4.5″ production liner Horizontal Multilateral well.