D. Gomes, Alfredo Matos, Emanuel Fonseca, R. Aguiar
{"title":"Deploying and testing a NGN testbed IST-daidalos testbed","authors":"D. Gomes, Alfredo Matos, Emanuel Fonseca, R. Aguiar","doi":"10.1109/TRIDENTCOM.2009.4976259","DOIUrl":null,"url":null,"abstract":"In the last 3 years a medium size NGN testbed was deployed at the Instituto de Telecomunicações of Aveiro in order to support the validation of the project IST-Daidalos. This paper intends to describe not only the work done in order to setup and maintain this testbed but also to elucidate the community of some of the caveats of creating and managing such a testbed in a environment where most of the prototypes are under specification and requirements change quickly. In this paper we also present some of the methodology used in order to extract results from this testbed and an insight to what can be done in the future.","PeriodicalId":254380,"journal":{"name":"2009 5th International Conference on Testbeds and Research Infrastructures for the Development of Networks & Communities and Workshops","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-04-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 5th International Conference on Testbeds and Research Infrastructures for the Development of Networks & Communities and Workshops","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TRIDENTCOM.2009.4976259","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
In the last 3 years a medium size NGN testbed was deployed at the Instituto de Telecomunicações of Aveiro in order to support the validation of the project IST-Daidalos. This paper intends to describe not only the work done in order to setup and maintain this testbed but also to elucidate the community of some of the caveats of creating and managing such a testbed in a environment where most of the prototypes are under specification and requirements change quickly. In this paper we also present some of the methodology used in order to extract results from this testbed and an insight to what can be done in the future.