OPTIMASI BIAYA PRODUKSI PADA PT. XYZ DENGAN PENGENDALIAN PERSEDIAAN BAHAN BAKU SODIUM TRYPOLYPHATE

Arif Budi Sulistyo, Toha Ikhsan, Pugy Gautama
{"title":"OPTIMASI BIAYA PRODUKSI PADA PT. XYZ DENGAN PENGENDALIAN PERSEDIAAN BAHAN BAKU SODIUM TRYPOLYPHATE","authors":"Arif Budi Sulistyo, Toha Ikhsan, Pugy Gautama","doi":"10.47080/intent.v6i1.2591","DOIUrl":null,"url":null,"abstract":"This study aims to compare the Economic Order Quantity and Just In Time inventory methods to determine which inventory management strategy is best for PT XYZ. Observation, documentation, and interviews are the data collection methods used in this study. EOQ Formula, Safety Stock, Reorder Point, and Just In Time Formula are the data analysis techniques used in this study. The findings show that the component cost of raw material inventory using the EOQ method, storage costs IDR 2,312/order, and total inventory costs IDR 16,775,553. The JIT method reveals that the total cost of inventory is IDR 1,798,711. An inventory system with JIT that only has an inventory cost of 1,798,711 can reduce costs by about 43% more effectively, according to JIT and EOQ studies. The findings show that the component cost of raw material inventory using the EOQ method, storage costs IDR 2,312/order, and total inventory costs IDR 16,775,553. The JIT method reveals that the total cost of inventory is IDR 1,798,711. An inventory system with JIT that only has an inventory cost of 1,798,711 can reduce costs by about 43% more effectively, according to JIT and EOQ studies.","PeriodicalId":276998,"journal":{"name":"Jurnal Intent: Jurnal Industri dan Teknologi Terpadu","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Intent: Jurnal Industri dan Teknologi Terpadu","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47080/intent.v6i1.2591","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to compare the Economic Order Quantity and Just In Time inventory methods to determine which inventory management strategy is best for PT XYZ. Observation, documentation, and interviews are the data collection methods used in this study. EOQ Formula, Safety Stock, Reorder Point, and Just In Time Formula are the data analysis techniques used in this study. The findings show that the component cost of raw material inventory using the EOQ method, storage costs IDR 2,312/order, and total inventory costs IDR 16,775,553. The JIT method reveals that the total cost of inventory is IDR 1,798,711. An inventory system with JIT that only has an inventory cost of 1,798,711 can reduce costs by about 43% more effectively, according to JIT and EOQ studies. The findings show that the component cost of raw material inventory using the EOQ method, storage costs IDR 2,312/order, and total inventory costs IDR 16,775,553. The JIT method reveals that the total cost of inventory is IDR 1,798,711. An inventory system with JIT that only has an inventory cost of 1,798,711 can reduce costs by about 43% more effectively, according to JIT and EOQ studies.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
优化PT. XYZ的生产成本,控制TRYPOLYPHATE钠的原料供应
本研究旨在比较经济订货量和准时制库存方法,以确定哪种库存管理策略最适合PT XYZ。观察、文献和访谈是本研究中使用的数据收集方法。EOQ公式、安全库存、再订货点和准时制公式是本研究中使用的数据分析技术。研究结果表明,采用EOQ法进行原材料库存的零部件成本,仓储成本为2,312/单,总库存成本为16,775,553。JIT方法显示,库存总成本为1,798,711印尼盾。根据JIT和EOQ的研究,采用JIT的库存系统只有1,798,711个库存成本,可以更有效地降低约43%的成本。研究结果表明,采用EOQ法进行原材料库存的零部件成本,仓储成本为2,312/单,总库存成本为16,775,553。JIT方法显示,库存总成本为1,798,711印尼盾。根据JIT和EOQ的研究,采用JIT的库存系统只有1,798,711个库存成本,可以更有效地降低约43%的成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS BEBAN KERJA UNTUK MENENTUKAN KEBUTUHAN TENAGA KERJA MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) PADA PT SO GOOD FOOD ANALISIS PERENCANAAN PERSEDIAAN BAHAN BAKU PADA PT. PESONA ARNOS BETON DI KEDAMEAN, GRESIK PENGARUH PASCA PANDEMI COVID-19 TERHADAP MOTIVASI PERJALANAN WISATA KE ANYER BANTEN METODE SCOR DAN AHP SEBAGAI PENGUKURAN KINERJA SUPPLY CHAIN MANAGEMENT PADA PABRIK GULA GEMPOLKREP (PERSERO) PENGUKURAN KEEFEKTIFAN MESIN LOHIA 1 MENGGUNAKAN METODE TOTAL PRODUCTIVE MAINTENANCE (TPM) DI PT. KERTA RAJASA RAYA, PLANT MOJOSARI
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1