{"title":"Military automatic test systems acquisition-the Navy Requirements Officer perspective","authors":"S. Paul, C. Davis","doi":"10.1109/AUTEST.1997.633627","DOIUrl":null,"url":null,"abstract":"In the current environment of DOD downsizing, considerable savings can be achieved by timely, appropriate ATS decisions. Frequently decisions are made in an environment where ATS and support in general is down-played in favor of more glamorous \"smoke-and-fire\" budget elements. Sometimes this is a result of inadequate preparation, sometimes from a lack of understanding of the process, almost always from a lack of knowledge regarding the funding process where support and ATS interests are represented by the Requirements Officer (RO). This paper provides an overview of the RO's perspective.","PeriodicalId":369132,"journal":{"name":"1997 IEEE Autotestcon Proceedings AUTOTESTCON '97. IEEE Systems Readiness Technology Conference. Systems Readiness Supporting Global Needs and Awareness in the 21st Century","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"1997 IEEE Autotestcon Proceedings AUTOTESTCON '97. IEEE Systems Readiness Technology Conference. Systems Readiness Supporting Global Needs and Awareness in the 21st Century","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEST.1997.633627","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In the current environment of DOD downsizing, considerable savings can be achieved by timely, appropriate ATS decisions. Frequently decisions are made in an environment where ATS and support in general is down-played in favor of more glamorous "smoke-and-fire" budget elements. Sometimes this is a result of inadequate preparation, sometimes from a lack of understanding of the process, almost always from a lack of knowledge regarding the funding process where support and ATS interests are represented by the Requirements Officer (RO). This paper provides an overview of the RO's perspective.