Determination of the optimal size of the Energy Storage Systems in photovoltaic systems connected to the electricity network, through Mixed-Integer Linear Programming
Adrián Criollo Rios, Diego Xavier Morales Jadan, Freddy Narvaez Buestan
{"title":"Determination of the optimal size of the Energy Storage Systems in photovoltaic systems connected to the electricity network, through Mixed-Integer Linear Programming","authors":"Adrián Criollo Rios, Diego Xavier Morales Jadan, Freddy Narvaez Buestan","doi":"10.1109/ETCM.2018.8580308","DOIUrl":null,"url":null,"abstract":"This research and development project presents the optimization of BESS energy storage systems (Battery Energy Storage System) in photovoltaic systems connected to the electricity grid, using mixed integer linear programming algorithms. In the development of this work, the creation of a database of both load and generation profiles was first performed, the data obtained served to propose the mathematical optimization model together with their respective restrictions. The optimization model was solved through mixed linear programming algorithms and finally the optimization algorithm developed was tested for the electrical system of Santa Cruz Island, Galápagos province, where the integration of the electric grid with renewable energies is carried out as the PV generation.","PeriodicalId":334574,"journal":{"name":"2018 IEEE Third Ecuador Technical Chapters Meeting (ETCM)","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Third Ecuador Technical Chapters Meeting (ETCM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ETCM.2018.8580308","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This research and development project presents the optimization of BESS energy storage systems (Battery Energy Storage System) in photovoltaic systems connected to the electricity grid, using mixed integer linear programming algorithms. In the development of this work, the creation of a database of both load and generation profiles was first performed, the data obtained served to propose the mathematical optimization model together with their respective restrictions. The optimization model was solved through mixed linear programming algorithms and finally the optimization algorithm developed was tested for the electrical system of Santa Cruz Island, Galápagos province, where the integration of the electric grid with renewable energies is carried out as the PV generation.
本研发项目采用混合整数线性规划算法,对并网光伏系统中的BESS储能系统(Battery energy storage System)进行优化。在本工作的开发过程中,首先建立了负荷和发电概况的数据库,所获得的数据用于提出数学优化模型及其各自的限制条件。通过混合线性规划算法求解优化模型,最后将所开发的优化算法应用于Galápagos省圣克鲁斯岛电力系统进行测试,该电力系统采用可再生能源作为光伏发电进行并网。