M. Kezunovic, T. Popovic, S. Sternfeld, B. Fardanesh, B. Clowe, P. Myrda
{"title":"Substation Automated Data Analysis: Deployment Challenges","authors":"M. Kezunovic, T. Popovic, S. Sternfeld, B. Fardanesh, B. Clowe, P. Myrda","doi":"10.1109/SMARTGRID.2010.5622031","DOIUrl":null,"url":null,"abstract":"The paper focuses on deployment challenges for automated substation data analysis solutions. Through examples from recent deployment projects, the paper discusses the fact that both the utilities and suppliers are dealing with a set of requirements defined as a compromise between the needs of variety of in-house stakeholders. These requirements are prone to changes and that itself is one of the biggest challenges. In addition, the deployment is almost always faced with unexpected challenges from the production environment itself. The paper illustrates a gradual step-by-step approach from a solution demonstration to the production deployment. The first part focuses on the solution that analyzes digital fault recorder and digital protective relay data. In-house testing with both simulated data and with the data obtained from the field is discussed. The second part of the paper discuses implementation and deployment of a new circuit breaker recorder aimed at on-line monitoring circuit breaker operations.","PeriodicalId":106908,"journal":{"name":"2010 First IEEE International Conference on Smart Grid Communications","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 First IEEE International Conference on Smart Grid Communications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SMARTGRID.2010.5622031","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The paper focuses on deployment challenges for automated substation data analysis solutions. Through examples from recent deployment projects, the paper discusses the fact that both the utilities and suppliers are dealing with a set of requirements defined as a compromise between the needs of variety of in-house stakeholders. These requirements are prone to changes and that itself is one of the biggest challenges. In addition, the deployment is almost always faced with unexpected challenges from the production environment itself. The paper illustrates a gradual step-by-step approach from a solution demonstration to the production deployment. The first part focuses on the solution that analyzes digital fault recorder and digital protective relay data. In-house testing with both simulated data and with the data obtained from the field is discussed. The second part of the paper discuses implementation and deployment of a new circuit breaker recorder aimed at on-line monitoring circuit breaker operations.