Simulation Exercise for Collaborative Planning System / Last Planner System (COLPLASSE)

N. Raghavan, K. Varghese, A. Mahalingam, V. K. Delhi
{"title":"Simulation Exercise for Collaborative Planning System / Last Planner System (COLPLASSE)","authors":"N. Raghavan, K. Varghese, A. Mahalingam, V. K. Delhi","doi":"10.24928/2018/0429","DOIUrl":null,"url":null,"abstract":"The Last Planner System (LPS TM )is becoming popular for project management all over the world. Though the practitioners are able to follow the concepts quite well, they sometimes find it difficult to develop the required processes and templates, particularly in organisations and environments where systematic planning practices are not that prevalent. Structured templates, simulations, or games for LPS are also not freely available in the open domain. A simulation exercise, COLPLASSE (COLlaborative PLAnning System Simulation Exercise), has been developed to cater to this felt need. COLPLASSE is based on simple Excel spreadsheets and uses work plans for developing Look Ahead Plans and Weekly planning over the many weeks required for project completion. It has provisions to simulate random delays due to inclement external environmental conditions or variations in productivity due to various causes. It computes PPC automatically and simultaneously draws continuous charts for PPC and Root Cause Analysis over the Project completion period. It is simple to use and with further improvements being planned, can develop into a powerful tool for training or simulation or actual use along with LPS. Further research is proposed to be done using this simulation with various groups to evaluate its capabilities for helping early practitioners to use LPS.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0429","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The Last Planner System (LPS TM )is becoming popular for project management all over the world. Though the practitioners are able to follow the concepts quite well, they sometimes find it difficult to develop the required processes and templates, particularly in organisations and environments where systematic planning practices are not that prevalent. Structured templates, simulations, or games for LPS are also not freely available in the open domain. A simulation exercise, COLPLASSE (COLlaborative PLAnning System Simulation Exercise), has been developed to cater to this felt need. COLPLASSE is based on simple Excel spreadsheets and uses work plans for developing Look Ahead Plans and Weekly planning over the many weeks required for project completion. It has provisions to simulate random delays due to inclement external environmental conditions or variations in productivity due to various causes. It computes PPC automatically and simultaneously draws continuous charts for PPC and Root Cause Analysis over the Project completion period. It is simple to use and with further improvements being planned, can develop into a powerful tool for training or simulation or actual use along with LPS. Further research is proposed to be done using this simulation with various groups to evaluate its capabilities for helping early practitioners to use LPS.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
协同规划系统/最后规划系统(COLPLASSE)模拟练习
最后计划者系统(LPS TM)在世界各地的项目管理中越来越流行。尽管从业者能够很好地遵循这些概念,但他们有时会发现很难开发所需的过程和模板,特别是在系统规划实践不那么普遍的组织和环境中。针对LPS的结构化模板、模拟或游戏在开放领域也不是免费提供的。为了满足这一需要,我们开发了一种名为COLPLASSE(协同规划系统模拟练习)的模拟练习。COLPLASSE基于简单的Excel电子表格,并使用工作计划来制定前瞻性计划和每周计划,以完成项目所需的许多周。它有条款来模拟由于恶劣的外部环境条件或由于各种原因导致的生产率变化而导致的随机延迟。自动计算PPC,并在项目完成期间同时绘制连续图表用于PPC和根本原因分析。它使用简单,并且随着进一步的改进计划,可以发展成为一个强大的工具,用于培训或模拟或与LPS一起实际使用。进一步的研究建议使用该模拟与不同的组来评估其帮助早期从业者使用LPS的能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Enhancing Labour Productivity in Petrochemical Construction and Maintenance Projects Complex Production Systems: Non-Linear and Non-Repetitive Projects Towards Facility Management Participation in Design: A UCSF Case Study Project Delivery Through Lean Principles Across All Disciplnes of Construction in a Developing Country Environment Short Takt Time in Construction – a Practical Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1