FMEA/CIL implementation for the Space Shuttle new turbopumps

M. Littlefield
{"title":"FMEA/CIL implementation for the Space Shuttle new turbopumps","authors":"M. Littlefield","doi":"10.1109/RAMS.1996.500641","DOIUrl":null,"url":null,"abstract":"To satisfy a reliability requirement which necessitated the implementation of the Space Shuttle high pressure oxidizer turbopump (HPOTP) failure mode effects analysis (FMEA) and critical items list (CIL), Pratt & Whitney (P&W) developed a plan that emphasized the utilization of existing systems and the standardization of subcontractor reporting documentation. Prior to acceptance testing of the first flight HPOTP, an audit of the quality assurance records for all CIL required inspections was performed to determine if the inspections had been made and accepted by quality assurance (QA). 99.9% of the CIL inspections were verified as being successfully completed, far exceeding the 90% NASA verification requirement. This level of compliance was achieved several years sooner and with less than a third the manpower utilized by another contractor's system. The implementation and audit activities uncovered deficiencies that forced quick improvements to inspection methods, documentation and material acceptance practices. Additionally, it reduced the number of government mandatory inspections thus reducing cost and removing potential schedule constraints. Essential to the success of CIL implementation were the analytical procedures used to identify and ensure the test/inspectability of the inspections, testing and process controls (CIL characteristics) performed to minimize the probability of critical part failures.","PeriodicalId":393833,"journal":{"name":"Proceedings of 1996 Annual Reliability and Maintainability Symposium","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1996-01-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 1996 Annual Reliability and Maintainability Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.1996.500641","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

To satisfy a reliability requirement which necessitated the implementation of the Space Shuttle high pressure oxidizer turbopump (HPOTP) failure mode effects analysis (FMEA) and critical items list (CIL), Pratt & Whitney (P&W) developed a plan that emphasized the utilization of existing systems and the standardization of subcontractor reporting documentation. Prior to acceptance testing of the first flight HPOTP, an audit of the quality assurance records for all CIL required inspections was performed to determine if the inspections had been made and accepted by quality assurance (QA). 99.9% of the CIL inspections were verified as being successfully completed, far exceeding the 90% NASA verification requirement. This level of compliance was achieved several years sooner and with less than a third the manpower utilized by another contractor's system. The implementation and audit activities uncovered deficiencies that forced quick improvements to inspection methods, documentation and material acceptance practices. Additionally, it reduced the number of government mandatory inspections thus reducing cost and removing potential schedule constraints. Essential to the success of CIL implementation were the analytical procedures used to identify and ensure the test/inspectability of the inspections, testing and process controls (CIL characteristics) performed to minimize the probability of critical part failures.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
航天飞机新型涡轮泵的FMEA/CIL实施
为了满足航天飞机高压氧化剂涡轮泵(HPOTP)失效模式影响分析(FMEA)和关键项目清单(CIL)的可靠性要求,普惠公司(P&W)制定了一项计划,强调现有系统的利用和分包商报告文件的标准化。在首飞HPOTP验收测试之前,对所有CIL要求检查的质量保证记录进行了审计,以确定检查是否已由质量保证(QA)进行并接受。99.9%的CIL检查被验证为成功完成,远远超过了NASA 90%的验证要求。这种程度的遵守比另一个承包商的系统早了好几年,所用的人力还不到另一个承包商系统的三分之一。执行和审计活动发现了缺陷,迫使对检查方法、文件和材料验收做法进行快速改进。此外,它减少了政府强制检查的次数,从而降低了成本并消除了潜在的进度限制。CIL实施成功的关键是用于识别和确保检查、测试和过程控制(CIL特征)的测试/可检查性的分析程序,以最大限度地减少关键部件故障的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Development of a fault isolation procedure [space station reliability] The reliability of error correcting code implementations [IC reliability assessment] Commercial-off-the shelf (COTS): a challenge to military equipment reliability A combined analysis approach to assessing requirements for safety critical real-time control systems Fault tree analysis and binary decision diagrams
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1