A new integrated hybrid power supply system for telecom site sharing solution

Yun Wang, Lu Xu, Jiankai Gao, Liwei Liu
{"title":"A new integrated hybrid power supply system for telecom site sharing solution","authors":"Yun Wang, Lu Xu, Jiankai Gao, Liwei Liu","doi":"10.1109/INTLEC.2015.7572454","DOIUrl":null,"url":null,"abstract":"Site infrastructure sharing is the trend of future base station construction. Telecom infrastructure operators require for smooth upgrading and low TCO when sharing sites power supply, spaces and operation management. This paper introduces a new integrated hybrid power supply system suitable for the site sharing requirements. It perfectly combines many functions together, such as energy generation, conversion, control, distribution and metering, which support multiple energy access including solar, grid, many kinds of battery storage, -48V DC power output directly with multi-channel distribution for different operators loads and common platform management and control for smooth upgrading of site sharing. With the integrated variable speed generator inside, the system can maximize the fuel efficiency based on the actual load capacity; accordingly, fuel consumption could be reduced sharply at low load capacity. Two systems can work in parallel with a total power output, making the expansion of energy generation easily, which could be applied to meet the increasing electricity requirements when more operators add in. This solution is much better than that has been applied before. The system is designed in the way that both power conversion modules and intelligent power distribution units can be smoothly expanded. AC/DC and DC/DC conversion modules can be exchanged freely in the same slot position to shrink the volume of the system. Besides, different battery storage group also can be expanded by HBTS (hybrid battery transfer system, embedded structure). The electricity used by different operators could be metered by central supervising unit or intelligent electric meter. The system combines multiple hybrid energy solutions to cope with different site sharing scenarios to comprehensively reduce site sharing TCO. It helps telecom infrastructure operators invest capital step by step and maximize the ROI.","PeriodicalId":211948,"journal":{"name":"2015 IEEE International Telecommunications Energy Conference (INTELEC)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE International Telecommunications Energy Conference (INTELEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.2015.7572454","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Site infrastructure sharing is the trend of future base station construction. Telecom infrastructure operators require for smooth upgrading and low TCO when sharing sites power supply, spaces and operation management. This paper introduces a new integrated hybrid power supply system suitable for the site sharing requirements. It perfectly combines many functions together, such as energy generation, conversion, control, distribution and metering, which support multiple energy access including solar, grid, many kinds of battery storage, -48V DC power output directly with multi-channel distribution for different operators loads and common platform management and control for smooth upgrading of site sharing. With the integrated variable speed generator inside, the system can maximize the fuel efficiency based on the actual load capacity; accordingly, fuel consumption could be reduced sharply at low load capacity. Two systems can work in parallel with a total power output, making the expansion of energy generation easily, which could be applied to meet the increasing electricity requirements when more operators add in. This solution is much better than that has been applied before. The system is designed in the way that both power conversion modules and intelligent power distribution units can be smoothly expanded. AC/DC and DC/DC conversion modules can be exchanged freely in the same slot position to shrink the volume of the system. Besides, different battery storage group also can be expanded by HBTS (hybrid battery transfer system, embedded structure). The electricity used by different operators could be metered by central supervising unit or intelligent electric meter. The system combines multiple hybrid energy solutions to cope with different site sharing scenarios to comprehensively reduce site sharing TCO. It helps telecom infrastructure operators invest capital step by step and maximize the ROI.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种新的电信站点共享集成混合供电系统解决方案
站点基础设施共享是未来基站建设的趋势。电信基础设施运营商在共享站点供电、空间和运营管理时,需要实现平稳升级和低TCO。本文介绍了一种适合站点共享要求的新型集成混合供电系统。它将发电、转换、控制、配电、计量等功能完美地结合在一起,支持太阳能、电网、多种蓄电池储能等多种能源接入,支持-48V直流电源直接输出,可针对不同运营商负载进行多通道配电,支持通用平台管理和控制,实现站点共享的顺利升级。系统内部集成了变速发电机,可根据实际负载能力最大限度地提高燃油效率;因此,在低负荷情况下,燃料消耗可以大大减少。两个系统可以在一个总输出功率下并行工作,使发电量的扩展变得容易,当更多的运营商加入时,可以应用于满足不断增长的电力需求。这个解决方案比以前应用过的要好得多。系统的设计思路是电源转换模块和智能配电单元都可以顺利扩展。AC/DC和DC/DC转换模块可在同一槽位自由互换,减小系统体积。此外,还可以通过HBTS(混合电池传输系统,嵌入式结构)扩展不同的电池存储组。不同操作员的用电量可以通过中央监控装置或智能电表进行计量。系统结合多种混合能源解决方案,应对不同站点共享场景,全面降低站点共享TCO。它帮助电信基础设施运营商逐步投入资金,实现投资回报率最大化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Energy Optimization Model (EOM) to reduce mobile service providers network costs: A multi-objective optimization approach Peak-cut control of smart energy BTS: Power control technology for reducing the power consumed by base stations Performance characteristic of interleaved LLC resonant converter with phase shift modulation Research and application of green power system for new data centers The cost benefits of deploying line powering systems from a centralized location over an existing a copper twisted-pair outside plant to energize remote equipment in the distributed telecom network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1