Agile Procurement and Dynamic Value for Money to Facilitate Agile Software Projects

D. Jamieson, K. Vinsen, G. Callender
{"title":"Agile Procurement and Dynamic Value for Money to Facilitate Agile Software Projects","authors":"D. Jamieson, K. Vinsen, G. Callender","doi":"10.1109/EUROMICRO.2006.17","DOIUrl":null,"url":null,"abstract":"In situations where software systems are developed under formal contractual arrangements it is common for the buyer and supplier to dispute whether value for money is being delivered, even though it is unlikely that either party will be capable of measuring this outcome. This problem is exacerbated by a basic incompatibility between the buyer's linear or sequential procurement process and the supplier's agile software development methodology. At the commencement of a software development contract it is probable that a supplier will have accepted terms and conditions relating to scope and price that are philosophically in opposition to agile principles, particularly in respect of an iterative elaboration of requirements. A range of suboptimal project outcomes, including budget and schedule blowouts, typically result in these situations. This paper proposes an agile procurement process that can operate in conjunction with an agile software development methodology to improve many aspects of software project delivery. This process is supported by a mechanism designed to give the buyer and supplier the ability to define and agree the value for money proposition at various milestones within the project y namic value for money","PeriodicalId":213772,"journal":{"name":"32nd EUROMICRO Conference on Software Engineering and Advanced Applications (EUROMICRO'06)","volume":"195 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"32nd EUROMICRO Conference on Software Engineering and Advanced Applications (EUROMICRO'06)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EUROMICRO.2006.17","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

Abstract

In situations where software systems are developed under formal contractual arrangements it is common for the buyer and supplier to dispute whether value for money is being delivered, even though it is unlikely that either party will be capable of measuring this outcome. This problem is exacerbated by a basic incompatibility between the buyer's linear or sequential procurement process and the supplier's agile software development methodology. At the commencement of a software development contract it is probable that a supplier will have accepted terms and conditions relating to scope and price that are philosophically in opposition to agile principles, particularly in respect of an iterative elaboration of requirements. A range of suboptimal project outcomes, including budget and schedule blowouts, typically result in these situations. This paper proposes an agile procurement process that can operate in conjunction with an agile software development methodology to improve many aspects of software project delivery. This process is supported by a mechanism designed to give the buyer and supplier the ability to define and agree the value for money proposition at various milestones within the project y namic value for money
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
敏捷采购和动态物有所值以促进敏捷软件项目
在软件系统是在正式合同安排下开发的情况下,买方和供应商通常会争论是否交付了物有所值,尽管任何一方都不太可能有能力衡量这一结果。买方的线性或顺序采购过程与供应商的敏捷软件开发方法之间的基本不兼容加剧了这个问题。在软件开发合同开始时,供应商很可能会接受与范围和价格相关的条款和条件,这些条款和条件在哲学上与敏捷原则相反,特别是在需求的迭代细化方面。一系列不理想的项目结果,包括预算和进度的井喷,通常会导致这些情况。本文提出了一个敏捷采购过程,它可以与敏捷软件开发方法结合使用,以改进软件项目交付的许多方面。该过程由一种机制支持,该机制旨在使买方和供应商能够通过动态物有所值来定义和商定项目中各个里程碑的物有所值主张
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Architectural Knowledge in Product Line Engineering: An Industrial Case Stu A Linguistic Patterns Approach for Requirements Specification SPI - A Role for Method Engineering Challenges of Acquisition Planning Agile Procurement and Dynamic Value for Money to Facilitate Agile Software Projects
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1