Opportunity cost analysis of renewable energy participation in AGC frequency regulation

Zhenyi Wang, Hua Ye, Bin Hu, Tianrui Xu, Ming Qu, Xinran He, Tao Ding
{"title":"Opportunity cost analysis of renewable energy participation in AGC frequency regulation","authors":"Zhenyi Wang, Hua Ye, Bin Hu, Tianrui Xu, Ming Qu, Xinran He, Tao Ding","doi":"10.1109/ACFPE56003.2022.9952213","DOIUrl":null,"url":null,"abstract":"As the penetration of renewable energy sources (RESs) in the grid increases, the requirements for Automatic Generation Control (AGC) frequency regulation and reserve services should also be adjusted. RESs have great potential to provide auxiliary services, however, RESs also face the problem of revenue trade-off between participation in the electricity energy market and the auxiliary frequency regulation service market. Opportunity cost can help decision-makers make a reasonable allocation of resources and maximize the theoretical benefits. In this context, an opportunity cost calculation model for RESs in delivering AGC service is provided in this paper. The calculation process of the opportunity cost for RESs to provide AGC auxiliary services is proposed in this paper. To analysis the opportunity cost of the RES plants providing frequency adjustment service, the modified IEEE 6-bus system with two thermal power plants, two wind power plants, and one photovoltaic power plant, is adopted in this paper. Firstly, the clearing results of the electric market in the system is adopted. Then, the opportunity cost of the RESs with AGC is calculated. Finally, by comparing the opportunity cost per unit of capacity of frequency adjustment service and the AGC compensation price in the North Grid of China and the Northwest Grid of China, the optimal decision of AGC participation factor $a$ can be obtained. Case studies reveal that the marginal opportunity cost of AGC capacity for RESs increase with the growth of the AGC capacity. As a result, total revenue of the RESs reaches the maximum value at an appropriate ratio of AGC capacity, and this ratio is the optimal decision.","PeriodicalId":198086,"journal":{"name":"2022 Asian Conference on Frontiers of Power and Energy (ACFPE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 Asian Conference on Frontiers of Power and Energy (ACFPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACFPE56003.2022.9952213","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

As the penetration of renewable energy sources (RESs) in the grid increases, the requirements for Automatic Generation Control (AGC) frequency regulation and reserve services should also be adjusted. RESs have great potential to provide auxiliary services, however, RESs also face the problem of revenue trade-off between participation in the electricity energy market and the auxiliary frequency regulation service market. Opportunity cost can help decision-makers make a reasonable allocation of resources and maximize the theoretical benefits. In this context, an opportunity cost calculation model for RESs in delivering AGC service is provided in this paper. The calculation process of the opportunity cost for RESs to provide AGC auxiliary services is proposed in this paper. To analysis the opportunity cost of the RES plants providing frequency adjustment service, the modified IEEE 6-bus system with two thermal power plants, two wind power plants, and one photovoltaic power plant, is adopted in this paper. Firstly, the clearing results of the electric market in the system is adopted. Then, the opportunity cost of the RESs with AGC is calculated. Finally, by comparing the opportunity cost per unit of capacity of frequency adjustment service and the AGC compensation price in the North Grid of China and the Northwest Grid of China, the optimal decision of AGC participation factor $a$ can be obtained. Case studies reveal that the marginal opportunity cost of AGC capacity for RESs increase with the growth of the AGC capacity. As a result, total revenue of the RESs reaches the maximum value at an appropriate ratio of AGC capacity, and this ratio is the optimal decision.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
可再生能源参与AGC频率调节的机会成本分析
随着可再生能源在电网中渗透率的提高,对自动发电控制(AGC)频率调节和备用服务的要求也应进行调整。电站具有提供辅助服务的巨大潜力,但电站也面临着参与电力能源市场与辅助调频服务市场之间的收益权衡问题。机会成本可以帮助决策者合理配置资源,实现理论效益最大化。在此背景下,本文给出了RESs提供AGC服务的机会成本计算模型。本文提出了RESs提供AGC辅助服务的机会成本的计算过程。为了分析可再生能源电厂提供调频服务的机会成本,本文采用改进的IEEE 6总线系统,其中包括2个火电厂、2个风力发电厂和1个光伏发电厂。首先,采用系统中电力市场的清算结果。然后,计算了具有AGC的RESs的机会成本。最后,通过比较北网和西北网的单位容量调频服务机会成本和AGC补偿价格,得出AGC参与因子$a$的最优决策。实例研究表明,随着AGC容量的增加,RESs的AGC容量边际机会成本增加。因此,在适当的AGC容量比例下,RESs的总收入达到最大值,该比例为最优决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Projection Method of Energy Storage System in Power Spot Market for Renewable Accommodation A Copeland-Method-based Weakness Identification for the Components in Transmission Systems Under Natural Disasters Optimization Clearing Model of Regional Integrated Electricity Market Transaction in the Dual Track System of Planning and Market Mechanism analysis of power fluctuation of wind power AC transmission channel caused by DC commutation failure Research on energy regulation strategy of six-phase motor for multi-mode combined propulsion system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1