Rescheduling to minimize makespan on a changing number of identical processors

C. Tovey
{"title":"Rescheduling to minimize makespan on a changing number of identical processors","authors":"C. Tovey","doi":"10.1002/NAV.3800330414","DOIUrl":null,"url":null,"abstract":"We consider the problem of rescheduling n jobs to minimize the makespan on m parallel identical processors when m changes value. We show this problem to be NP-hard in general. Call a list schedule totally optimal if it is optimal for all m = 1, …,n. When n is less than 6, there always exists a totally optimal schedule, but for n ≥ 6 this can fail. We show that an exact solution is less robust than the largest processing time first (LPT) heuristic and discuss implications for polynomial approximation schemes and hierarchical planning models.","PeriodicalId":431817,"journal":{"name":"Naval Research Logistics Quarterly","volume":"82 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1986-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naval Research Logistics Quarterly","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/NAV.3800330414","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

We consider the problem of rescheduling n jobs to minimize the makespan on m parallel identical processors when m changes value. We show this problem to be NP-hard in general. Call a list schedule totally optimal if it is optimal for all m = 1, …,n. When n is less than 6, there always exists a totally optimal schedule, but for n ≥ 6 this can fail. We show that an exact solution is less robust than the largest processing time first (LPT) heuristic and discuss implications for polynomial approximation schemes and hierarchical planning models.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在相同处理器数量不断变化的情况下,重新调度以最小化最大时间跨度
我们考虑当m的值发生变化时,如何重新调度n个作业以最小化m个并行相同处理器上的最大完工时间的问题。我们证明这个问题一般来说是np困难的。如果一个列表调度对所有m = 1,…,n都是最优的,那么它就是完全最优的。当n小于6时,总存在一个完全最优的调度,但当n≥6时,这个调度可能失效。我们证明了精确解不如最大处理时间优先(LPT)启发式鲁棒性,并讨论了多项式近似方案和分层规划模型的含义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
On estimating population characteristics from record‐breaking observations. i. parametric results Optimal replacement for fault‐tolerant systems Algorithms for the minimax transportation problem Nature of renyi's entropy and associated divergence function Rescheduling to minimize makespan on a changing number of identical processors
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1