Causes of Final Account Closing Delay: A Theoretical Framework

Zarabizan Zakaria, S. Ismail, A. Yusof
{"title":"Causes of Final Account Closing Delay: A Theoretical Framework","authors":"Zarabizan Zakaria, S. Ismail, A. Yusof","doi":"10.5281/zenodo.1089014","DOIUrl":null,"url":null,"abstract":"Delay can be defined as time overrun or extension of time to complete the project. There are high possibilities that delay issues in final account closing cannot be avoided especially in construction project in Malaysia which is unique and dynamic in the terms of nature of design and technical skill. Delay in final account closing is a situation when the actual planning (time and budget allocation) of a construction project exceeds the planned schedule or on the other hand, final account closing exceeds the time and other provisions specified in the contract. The causes of delay discussed in this paper are appraised from the literature review. There are two main types of delay: excusable delay and non-excusable delay. The literature reviews on the delay in final account closing which is then translated into a theoretical framework are summarized in the context of construction players and academician perspective. It is anticipated that the finding reported in this paper could assist the planning of future strategies and guidelines of final account closing for the betterment of construction projects in Malaysia. Keywords—Construction industry, construction contract, final account closing, delay.","PeriodicalId":224473,"journal":{"name":"World Academy of Science, Engineering and Technology, International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Academy of Science, Engineering and Technology, International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5281/zenodo.1089014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Delay can be defined as time overrun or extension of time to complete the project. There are high possibilities that delay issues in final account closing cannot be avoided especially in construction project in Malaysia which is unique and dynamic in the terms of nature of design and technical skill. Delay in final account closing is a situation when the actual planning (time and budget allocation) of a construction project exceeds the planned schedule or on the other hand, final account closing exceeds the time and other provisions specified in the contract. The causes of delay discussed in this paper are appraised from the literature review. There are two main types of delay: excusable delay and non-excusable delay. The literature reviews on the delay in final account closing which is then translated into a theoretical framework are summarized in the context of construction players and academician perspective. It is anticipated that the finding reported in this paper could assist the planning of future strategies and guidelines of final account closing for the betterment of construction projects in Malaysia. Keywords—Construction industry, construction contract, final account closing, delay.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
决算结帐延迟的原因:一个理论框架
延迟可以定义为完成项目的时间超出或时间延长。有很高的可能性,延迟问题在最终账户关闭无法避免,特别是在马来西亚的建筑项目,这是独特的和动态的设计和技术技能的性质方面。决算逾期是指建设项目的实际计划(时间和预算分配)超过计划进度,或者决算超出合同规定的时间和其他规定的情况。通过文献综述,对本文讨论的延迟原因进行了评价。延迟主要有两种类型:可原谅的延迟和不可原谅的延迟。在建筑参与者和学者视角的背景下,总结了关于最终账户关闭延迟的文献综述,然后将其转化为理论框架。预计本文报告的调查结果将有助于规划未来的战略和结帐准则,以改善马来西亚的建筑项目。关键词:建筑业;施工合同;决算;
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Application of De Novo Programming Approach for Optimizing the Business Process NewPerceptual Organization within Temporal Displacement The Attitude of Second Year Pharmacy Students towards Lectures, Exams and E-Learning Adaptive Conjoint Analysis of Professionals’ Job Preferences Emotional Intelligence and Leadership Profiles among Students’ Representative Council of Malaysian Public Universities
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1