Managing the transition of a discontinuous innovation project to operational status

M. Rice, R. Leifer, G. O'Connor
{"title":"Managing the transition of a discontinuous innovation project to operational status","authors":"M. Rice, R. Leifer, G. O'Connor","doi":"10.1109/EMS.2000.872570","DOIUrl":null,"url":null,"abstract":"Longitudinal data collected from twelve discontinuous innovation projects over 5 years in 10 large, mature firms reveal the challenges of managing the surprisingly difficult transition from R&D project to an operating unit. In these twelve projects a substantial \"readiness gap\" existed between the project teams and the receiving business units, leading us to propose the formation of a formal transition team as an organizational response for bridging this gap. The transition team and the organization's associated management structure must answer twelve critical questions before a project can be successfully transitioned. Based on an analysis of transition practices, we identify seven keys to improving the effectiveness of transition management.","PeriodicalId":440516,"journal":{"name":"Proceedings of the 2000 IEEE Engineering Management Society. EMS - 2000 (Cat. No.00CH37139)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-08-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2000 IEEE Engineering Management Society. EMS - 2000 (Cat. No.00CH37139)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMS.2000.872570","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

Longitudinal data collected from twelve discontinuous innovation projects over 5 years in 10 large, mature firms reveal the challenges of managing the surprisingly difficult transition from R&D project to an operating unit. In these twelve projects a substantial "readiness gap" existed between the project teams and the receiving business units, leading us to propose the formation of a formal transition team as an organizational response for bridging this gap. The transition team and the organization's associated management structure must answer twelve critical questions before a project can be successfully transitioned. Based on an analysis of transition practices, we identify seven keys to improving the effectiveness of transition management.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
管理一个中断的创新项目向可操作状态的转变
从10家大型成熟公司的12个连续创新项目中收集的纵向数据显示,管理从研发项目到运营部门的惊人困难过渡所面临的挑战。在这12个项目中,项目团队和接收业务单位之间存在着实质性的“准备差距”,这导致我们建议组建一个正式的过渡团队,作为弥合这一差距的组织响应。在项目成功过渡之前,过渡团队和组织的相关管理结构必须回答12个关键问题。基于对转型实践的分析,我们确定了提高转型管理有效性的七个关键。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Technology transfer in a complex environment: exploring key relationships The nature of the 21st century paradigm shift driven by the next-generation Internet Knowledge management in the professional services: lessons from functional linguistics Preventing escalation of commitment to dysfunctional marketing relationships: The unique case of customers Emergence of a new industrial paradigm: ICT supported customer service
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1