{"title":"电厂建设工程项目的施工进度管理与控制分析","authors":"国辉 于","doi":"10.37155/2661-4669-0311-32","DOIUrl":null,"url":null,"abstract":"在电厂建设工程项目的开展过程中,进度管理是一项非常必要的工作,若该项工作的实施效果不佳将会极大地影响到工程质量和成本投入,工程项目无法在规定日期内投入使用,将会给电厂运营造成极为不利的影响,电力生产的持续性和稳定性也将难以得到保证。本文首先介绍了电厂建设工程进度管理的概念,随后对加强电厂建设工程项目进度管理的建议进行了分析,希望能对电厂建设工程项目的进度管理和控制有所帮助。","PeriodicalId":431717,"journal":{"name":"国际建筑学","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"国际建筑学","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37155/2661-4669-0311-32","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
电厂建设工程项目的施工进度管理与控制分析
在电厂建设工程项目的开展过程中,进度管理是一项非常必要的工作,若该项工作的实施效果不佳将会极大地影响到工程质量和成本投入,工程项目无法在规定日期内投入使用,将会给电厂运营造成极为不利的影响,电力生产的持续性和稳定性也将难以得到保证。本文首先介绍了电厂建设工程进度管理的概念,随后对加强电厂建设工程项目进度管理的建议进行了分析,希望能对电厂建设工程项目的进度管理和控制有所帮助。
本文章由计算机程序翻译,如有差异,请以英文原文为准。