{"title":"Scheduling Traffic Matrices On General Switch Fabrics","authors":"Xiang Wu, A. Prakash, M. Mohiyuddin, A. Aziz","doi":"10.1109/HOTI.2006.22","DOIUrl":null,"url":null,"abstract":"A traffic matrix is an |S| times |T| matrix M, where Mij is a non-negative integer encoding the number of packets to be transferred from source i to sink j. Chang et al. (2001) have shown how to efficiently compute an optimum schedule for transferring packets from sources to sinks when the sources and sinks are connected via a rearrangeable fabric such as crossbar. We address the same problem when the switch fabric is not rearrangeable. Specifically, we (1) prove that the optimum scheduling problem is NP-hard for general switch fabrics, (2) identify a sub-class of fabrics for which the problem is polynomial-time solvable, and (3) develop a heuristic for the general case","PeriodicalId":288349,"journal":{"name":"14th IEEE Symposium on High-Performance Interconnects (HOTI'06)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"14th IEEE Symposium on High-Performance Interconnects (HOTI'06)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HOTI.2006.22","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
A traffic matrix is an |S| times |T| matrix M, where Mij is a non-negative integer encoding the number of packets to be transferred from source i to sink j. Chang et al. (2001) have shown how to efficiently compute an optimum schedule for transferring packets from sources to sinks when the sources and sinks are connected via a rearrangeable fabric such as crossbar. We address the same problem when the switch fabric is not rearrangeable. Specifically, we (1) prove that the optimum scheduling problem is NP-hard for general switch fabrics, (2) identify a sub-class of fabrics for which the problem is polynomial-time solvable, and (3) develop a heuristic for the general case
流量矩阵是一个|S| times |T|矩阵M,其中Mij是一个非负整数,编码从源i传输到接收器j的数据包数量。Chang等人(2001)展示了当源和接收器通过可重新排列的结构(如crossbar)连接时,如何有效地计算从源到接收器传输数据包的最佳调度。当交换机结构不可重新排列时,我们解决了同样的问题。具体来说,我们(1)证明了最优调度问题对于一般的交换结构是np困难的,(2)确定了问题是多项式时间可解的fabric子类,(3)开发了一般情况下的启发式