Development of API 11D1 and API 19AC Validation Grade V0 Barrier-Qualified Gravel Pack System for Troll Phase 3 Big-Bore, High-Rate Gas Completions on the Norwegian Continental Shelf

Aaron C. Hammer, Tom D Gonzalez, Herb P Dhuet, Hege Andresen, Siv Merete M Sunde, Elshan Jabrayilov, Iris Sok Yee Kam, Torstein Tviet
{"title":"Development of API 11D1 and API 19AC Validation Grade V0 Barrier-Qualified Gravel Pack System for Troll Phase 3 Big-Bore, High-Rate Gas Completions on the Norwegian Continental Shelf","authors":"Aaron C. Hammer, Tom D Gonzalez, Herb P Dhuet, Hege Andresen, Siv Merete M Sunde, Elshan Jabrayilov, Iris Sok Yee Kam, Torstein Tviet","doi":"10.2118/205403-ms","DOIUrl":null,"url":null,"abstract":"\n The Troll Phase 3 (TP3) wells were designed to enable high gas rates and sand free production for an expected lifetime of 40 years with a minimum pressure drop. By taking reservoir and production properties into account, open-hole gravel pack (GP) sand screens in the lower completion and big bore tubing in the upper completion were selected. To further reduce the pressure loss in the well, reduce rig time and cost, and reduce deployment risks, eliminating the intermediate completion was proposed. Traditionally, an intermediate completion is required to serve as a gas-tight barrier for running of the upper completion, mainly due to historical limitations of the GP extension (GP sleeve) not being a barrier qualified to API 19AC Validation grade V0 (referred to as V0 hereafter) after pumping sand slurry through it (post-erosion). An extensive qualification program was completed to qualify the GP system to API 11D1 and API 19AC V0 for use as a gas-tight barrier post-erosion. This allows the GP system to serve as a primary barrier while installing the upper completion and temporarily abandoning the well. The GP packer was qualified to API 11D1 V0 with the additional requirement to perform entire qualification in as-rolled casing and including a plug-in-tailpipe load case. The GP sleeve provided the most technically challenging requirements: a full-scale erosion test, immediate closure of the sleeve after pumping operation, followed by API 19AC Annex A V0 validation. Challenges were encountered trying to meet the rigorous V0 (zero bubble) acceptance criteria post-erosion. A significantly different approach was developed to achieve gas-tight performance in debris-laden environments. The new design successfully passed the post-erosion API 19AC V0 qualification to the full rating of the GP sleeve. The GP system development and qualification enabled the industry-first V0 post-erosion GP system for Equinor, which eliminates the need for an intermediate completion. This state-of-the-art gravel pack system enabled the simplified high gas rate, big-bore well design, not previously possible given well barrier considerations. The reduced pressure drop across the lower completion is expected to yield a higher gas production rate for the 40 years expected well life, contributing significant value to the TP3 project.","PeriodicalId":277521,"journal":{"name":"Day 2 Wed, September 08, 2021","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, September 08, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205403-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Troll Phase 3 (TP3) wells were designed to enable high gas rates and sand free production for an expected lifetime of 40 years with a minimum pressure drop. By taking reservoir and production properties into account, open-hole gravel pack (GP) sand screens in the lower completion and big bore tubing in the upper completion were selected. To further reduce the pressure loss in the well, reduce rig time and cost, and reduce deployment risks, eliminating the intermediate completion was proposed. Traditionally, an intermediate completion is required to serve as a gas-tight barrier for running of the upper completion, mainly due to historical limitations of the GP extension (GP sleeve) not being a barrier qualified to API 19AC Validation grade V0 (referred to as V0 hereafter) after pumping sand slurry through it (post-erosion). An extensive qualification program was completed to qualify the GP system to API 11D1 and API 19AC V0 for use as a gas-tight barrier post-erosion. This allows the GP system to serve as a primary barrier while installing the upper completion and temporarily abandoning the well. The GP packer was qualified to API 11D1 V0 with the additional requirement to perform entire qualification in as-rolled casing and including a plug-in-tailpipe load case. The GP sleeve provided the most technically challenging requirements: a full-scale erosion test, immediate closure of the sleeve after pumping operation, followed by API 19AC Annex A V0 validation. Challenges were encountered trying to meet the rigorous V0 (zero bubble) acceptance criteria post-erosion. A significantly different approach was developed to achieve gas-tight performance in debris-laden environments. The new design successfully passed the post-erosion API 19AC V0 qualification to the full rating of the GP sleeve. The GP system development and qualification enabled the industry-first V0 post-erosion GP system for Equinor, which eliminates the need for an intermediate completion. This state-of-the-art gravel pack system enabled the simplified high gas rate, big-bore well design, not previously possible given well barrier considerations. The reduced pressure drop across the lower completion is expected to yield a higher gas production rate for the 40 years expected well life, contributing significant value to the TP3 project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
开发API 11D1和API 19AC V0级砾石充填系统,用于挪威大陆架Troll 3期大口径、高速率天然气完井
Troll第三阶段(TP3)井的设计目标是实现高产气量和无砂生产,预计使用寿命为40年,压降最小。综合考虑储层和生产特性,选择了下部完井的裸眼砾石充填(GP)防砂筛管和上部完井的大管柱。为了进一步减少井内压力损失,减少钻机时间和成本,降低部署风险,建议取消中间完井。传统上,中间完井需要作为上部完井的气密屏障,这主要是由于GP延伸段(GP滑套)的历史局限性,在泵送砂浆(后侵蚀)后,它不是符合API 19AC验证等级V0(以下简称V0)的屏障。为了使GP系统符合API 11D1和API 19AC V0的要求,以作为腐蚀后的气密屏障,完成了广泛的鉴定程序。这使得GP系统可以在安装上部完井和暂时弃井期间充当主要屏障。GP封隔器通过了API 11D1 V0的认证,并要求在轧制套管中进行完整的认证,包括一个插入式尾管负载箱。GP滑套提供了最具挑战性的技术要求:全面的侵蚀测试,泵送作业后立即关闭滑套,然后通过API 19AC附录a V0验证。在试图满足侵蚀后严格的V0(零气泡)接受标准时遇到了挑战。为了在充满碎屑的环境中实现气密性能,开发了一种截然不同的方法。新设计成功通过了侵蚀后API 19AC V0认证,达到GP滑套的全部等级。GP系统的开发和鉴定使Equinor公司实现了业界首个V0腐蚀后GP系统,从而消除了对中间完井的需求。这种最先进的砾石充填系统实现了简化的高产气量、大井眼设计,这在以前是不可能考虑井眼屏障的。较低完井段的压降降低,预计将在40年的预期井寿命内产生更高的产气量,为TP3项目贡献巨大价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Application of Long Endurance UAS for Top-Down Methane Emission Measurements of Oil and Gas Facilities in an Offshore Environment Application of Laser and Plasma for Thermal Assisted Drilling in Carbonated Formations Feasibility of Repurposing Offshore Decommissioned Gas Rigs into Fish Farms Development of API 11D1 and API 19AC Validation Grade V0 Barrier-Qualified Gravel Pack System for Troll Phase 3 Big-Bore, High-Rate Gas Completions on the Norwegian Continental Shelf Initiatives in UK Offshore Decommissioning Following the Wood Review: Applicability for Decommissioning in Norway
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1