Improvement of the Method for Measuring the Shock Tubes Velocity of Detonation by using a CNC Machined Base and Oscilloscopes

D. Kuhinek, B. Štimac, A. Hanic, Luka Čančar
{"title":"Improvement of the Method for Measuring the Shock Tubes Velocity of Detonation by using a CNC Machined Base and Oscilloscopes","authors":"D. Kuhinek, B. Štimac, A. Hanic, Luka Čančar","doi":"10.23919/MEASUREMENT47340.2019.8780094","DOIUrl":null,"url":null,"abstract":"The accuracy of shock tubes velocity of detonation measurement depends on the distance and signal delay time between two probes. In this paper, the distance error is reduced by using a special CNC machined base with the accuracy of 0.01 mm. The explosion light was converted into electrical signals by using photodiodes, the delay time was measured by using two oscilloscopes connected through an ethernet router to a computer and a virtual instrument was made in Labview data acquisition software. The measurements showed that the measurement conducted with oscilloscopes gives a consistent result.","PeriodicalId":129350,"journal":{"name":"2019 12th International Conference on Measurement","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 12th International Conference on Measurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/MEASUREMENT47340.2019.8780094","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The accuracy of shock tubes velocity of detonation measurement depends on the distance and signal delay time between two probes. In this paper, the distance error is reduced by using a special CNC machined base with the accuracy of 0.01 mm. The explosion light was converted into electrical signals by using photodiodes, the delay time was measured by using two oscilloscopes connected through an ethernet router to a computer and a virtual instrument was made in Labview data acquisition software. The measurements showed that the measurement conducted with oscilloscopes gives a consistent result.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用数控加工底座和示波器测量激波管爆轰速度方法的改进
激波管爆轰速度测量的精度取决于两个探头之间的距离和信号延迟时间。本文采用专用的数控加工底座,精度为0.01 mm,减小了距离误差。利用光电二极管将爆炸光转换成电信号,用两个示波器通过以太网路由器与计算机连接,并在Labview数据采集软件中制作虚拟仪器,测量延时时间。测量结果表明,用示波器进行的测量结果是一致的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Improvement of the Method for Measuring the Shock Tubes Velocity of Detonation by using a CNC Machined Base and Oscilloscopes Two-Dimensional Linear Comparative Calibration and Measurement Uncertainty Gradient Offset Calibration Used for B0Homogeneity The Effect of the Phenomenon of “Spectrum Leakage” on the Measurement of Power Quality Parameters Simple Seamless Multi-Range Current Measurement for Applications with a Large Dynamic Range
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1