Lianda Akti Leo Puteri, Conshita Hubertha Dhiu, M. E. Syharto, H. H. Purba
{"title":"Analisis Risiko Cost Overrun (Pembengkakan Biaya) Pada Proyek Konstruksi: Kajian Literatur","authors":"Lianda Akti Leo Puteri, Conshita Hubertha Dhiu, M. E. Syharto, H. H. Purba","doi":"10.19184/jrsl.v5i2.27915","DOIUrl":null,"url":null,"abstract":"Cost is a fundamental component of any construction project. Observations show that cost overrun is a significant phenomenon in the construction industry worldwide. Therefore, it is essential to know the factors that cause cost swelling. This paper aims to identify the recent top significant factors causing the swelling of construction project construction costs in both developed and developing countries (in particular) according to many variables over the last three decades. Through a comprehensive literature review, the most common and most common causes of cost swelling worldwide and developing countries, in particular, are listed; the factors are: Estimation Errors, Addition of items/VO, Finance, Team Participation, and environment, respectively factors are prioritized according to their emergence, and it is concluded that cost overrun factors vary significantly across countries. The studies on cost overrun factors in construction projects provide a reference for other projects that may be executed under similar circumstances and provide valuable information for international companies intending to provide construction projects. \nABSTRAK \nBiaya adalah komponen mendasar untuk setiap proyek konstruksi. Hasil pengamatan menunjukkan bahwa pembengkakan biaya (cost overrun) adalah fenomena utama dalam industri konstruksi di seluruh dunia. Oleh karena itu, penting untuk mengetahui faktor yang menyebabkan pembengkakan biaya. Tujuan penelitian ini adalah untuk mengidentifikasi faktor-faktor utama teratas terbaru penyebab pembengkakan biaya proyek konstruksi baik di negara maju dan berkembang (khususnya) menurut banyak variabel selama tiga dekade terakhir. Melalui tinjauan literatur yang komprehensif, yang paling umum dan penyebab pembengkakan biaya yang sering terjadi di seluruh dunia dan negara-negara berkembang khususnya, faktor-faktornya adalah: Kesalahan Estimasi, Penambahan item/VO, Finance, Partisipasi Tim dan lingkungan, masing-masing faktor diprioritaskan menurut kemunculannya dan disimpulkan bahwa faktor penyebab cost overrun sangat bervariasi di seluruh negara. Studi tentang faktor penyebab pembengkakan biaya dalam proyek konstruksi akan memberikan referensi untuk proyek lain yang mungkin dieksekusi dalam keadaan serupa dan juga akan memberikan informasi berharga bagi perusahaan internasional yang bermaksud untuk menyediakan proyek konstruksi.","PeriodicalId":247229,"journal":{"name":"Jurnal Rekayasa Sipil dan Lingkungan","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Rekayasa Sipil dan Lingkungan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19184/jrsl.v5i2.27915","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Cost is a fundamental component of any construction project. Observations show that cost overrun is a significant phenomenon in the construction industry worldwide. Therefore, it is essential to know the factors that cause cost swelling. This paper aims to identify the recent top significant factors causing the swelling of construction project construction costs in both developed and developing countries (in particular) according to many variables over the last three decades. Through a comprehensive literature review, the most common and most common causes of cost swelling worldwide and developing countries, in particular, are listed; the factors are: Estimation Errors, Addition of items/VO, Finance, Team Participation, and environment, respectively factors are prioritized according to their emergence, and it is concluded that cost overrun factors vary significantly across countries. The studies on cost overrun factors in construction projects provide a reference for other projects that may be executed under similar circumstances and provide valuable information for international companies intending to provide construction projects.
ABSTRAK
Biaya adalah komponen mendasar untuk setiap proyek konstruksi. Hasil pengamatan menunjukkan bahwa pembengkakan biaya (cost overrun) adalah fenomena utama dalam industri konstruksi di seluruh dunia. Oleh karena itu, penting untuk mengetahui faktor yang menyebabkan pembengkakan biaya. Tujuan penelitian ini adalah untuk mengidentifikasi faktor-faktor utama teratas terbaru penyebab pembengkakan biaya proyek konstruksi baik di negara maju dan berkembang (khususnya) menurut banyak variabel selama tiga dekade terakhir. Melalui tinjauan literatur yang komprehensif, yang paling umum dan penyebab pembengkakan biaya yang sering terjadi di seluruh dunia dan negara-negara berkembang khususnya, faktor-faktornya adalah: Kesalahan Estimasi, Penambahan item/VO, Finance, Partisipasi Tim dan lingkungan, masing-masing faktor diprioritaskan menurut kemunculannya dan disimpulkan bahwa faktor penyebab cost overrun sangat bervariasi di seluruh negara. Studi tentang faktor penyebab pembengkakan biaya dalam proyek konstruksi akan memberikan referensi untuk proyek lain yang mungkin dieksekusi dalam keadaan serupa dan juga akan memberikan informasi berharga bagi perusahaan internasional yang bermaksud untuk menyediakan proyek konstruksi.
成本是任何建设项目的基本组成部分。观察表明,成本超支是全世界建筑业的一个重要现象。因此,了解导致成本膨胀的因素是至关重要的。本文旨在根据过去三十年的许多变量,确定最近导致发达国家和发展中国家(特别是)建筑项目建设成本膨胀的最重要因素。通过全面的文献回顾,列出了世界范围内,特别是发展中国家成本膨胀的最常见和最常见的原因;这些因素是:估计误差,增加项目/VO,财务,团队参与和环境,分别根据其出现的因素进行优先排序,并得出结论,成本超支因素在各国之间差异很大。对建设项目成本超支因素的研究,为类似情况下可能实施的其他项目提供了参考,也为有意提供建设项目的国际公司提供了有价值的信息。【摘要】【摘要】紫杉醇醇醇醇醇醇醇醇醇醇醇醇醇醇醇醇醇醇。Hasil pengamatan menunjukkan bahwa pembengkakan biaya(成本超支)adalah现象(工业建设)。Oleh karena, penting untuk mengetahui fakto yang menyebabkan penbengkakan biaya。Tujuan penelitian ini adalah untuk mengidentifikasi factor - factor for utama teratas terbaru penyebab penbengkakan biaya proyek konstruksi baik di negara maju dan berkembang (khususnya) menurut banyak变量selama tiga dekade terakhir。Melalui tinjauan文学综合,yang paling umum dan penyebab pembengkakan biaya yang sering terjadi di seluruh dunia dan negara berkembang khususnya, factor - faktorya adalah: Kesalahan Estimasi, Penambahan项目/VO, Finance, Partisipasi Tim dan lingkungan, masing-masing factor for pripriitaskan menurut kemunculannya dan dispulpulkan bawa factor for penyebab成本超支sangat bervariasi di seluruh negara。学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习、学习。