Scheduling model for air traffic in Indonesia

Maureen Linda Caroline, Y. Asnar, A. I. Kistijantoro
{"title":"Scheduling model for air traffic in Indonesia","authors":"Maureen Linda Caroline, Y. Asnar, A. I. Kistijantoro","doi":"10.1109/TENCONSPRING.2016.7519382","DOIUrl":null,"url":null,"abstract":"Congestion because of increasing demand of air transportation occurs at several airports in Indonesia especially Soekarno-Hatta International Airport. In 2013, Soekarno-Hatta International Airport ranked 25th busiest airports in the world by Airports Council International. One of several ways to enlarge capacity of airports is to improve efficiency current infrastructure utilization with optimizing schedule. Three referred optimization models are model of Beasley et al. which optimizes runway utilization, Bertsimas and Stock Patterson's model which optimizes air space capacity allocation and Lulli and Odoni's model which are macroscopic model of Bertsimas and Stock Patterson's model. Unfortunately, Lulli and Odoni's model cannot studied further because of lack information about increasing convex function. The other models modified from integer program to constraint satisfaction optimization program (CSOP) so that the models are flexible to modify and the solution can be local optimum. Because of these advantages, rescheduling can be performed when there was little change in flight schedule. In addition, several constraints are added to modification of model of Beasley et al. such as flight continued constraint. Based on tests, modification of model of Beasley et al. success to reduce delays and modification of Bertsimas and Stock Patterson's model success to do a simulation.","PeriodicalId":166275,"journal":{"name":"2016 IEEE Region 10 Symposium (TENSYMP)","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE Region 10 Symposium (TENSYMP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TENCONSPRING.2016.7519382","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Congestion because of increasing demand of air transportation occurs at several airports in Indonesia especially Soekarno-Hatta International Airport. In 2013, Soekarno-Hatta International Airport ranked 25th busiest airports in the world by Airports Council International. One of several ways to enlarge capacity of airports is to improve efficiency current infrastructure utilization with optimizing schedule. Three referred optimization models are model of Beasley et al. which optimizes runway utilization, Bertsimas and Stock Patterson's model which optimizes air space capacity allocation and Lulli and Odoni's model which are macroscopic model of Bertsimas and Stock Patterson's model. Unfortunately, Lulli and Odoni's model cannot studied further because of lack information about increasing convex function. The other models modified from integer program to constraint satisfaction optimization program (CSOP) so that the models are flexible to modify and the solution can be local optimum. Because of these advantages, rescheduling can be performed when there was little change in flight schedule. In addition, several constraints are added to modification of model of Beasley et al. such as flight continued constraint. Based on tests, modification of model of Beasley et al. success to reduce delays and modification of Bertsimas and Stock Patterson's model success to do a simulation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
印度尼西亚空中交通调度模型
由于航空运输需求的增加,印度尼西亚的几个机场出现了拥堵,特别是苏加诺-哈达国际机场。2013年,苏加诺-哈达国际机场在国际机场协会的全球最繁忙机场中排名第25位。通过优化调度,提高机场的效率和现有基础设施的利用率,是扩大机场容量的几种途径之一。参考的三种优化模型分别是Beasley等人优化跑道利用率的模型,Bertsimas和Stock Patterson优化空域容量分配的模型,以及Lulli和Odoni的模型,即Bertsimas和Stock Patterson模型的宏观模型。不幸的是,Lulli和Odoni的模型由于缺乏关于凸函数增加的信息而无法进一步研究。其他模型由整数规划改进为约束满足优化规划(CSOP),使模型具有可修改的灵活性和求解的局部最优性。由于这些优点,可以在航班时刻表变化不大的情况下进行重新调度。此外,在Beasley等人的模型修正中增加了飞行持续约束等约束条件。在测试的基础上,修改Beasley等人的模型成功减少了延迟,修改Bertsimas和Stock Patterson的模型成功做了仿真。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Interaction techniques using head gaze for virtual reality Tree-based protocol for ad hoc networks constructed with data transmission modems Formal reliability analysis of protective systems in smart grids Comparative analysis of PCA and KPCA on paddy growth stages classification Short term load forecasting of Eid Al Fitr holiday by using interval Type-2 Fuzzy Inference System (Case study: Electrical system of Java Bali in Indonesia)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1