Critical considerations for utility/cogeneration inter tie protection scheme configuration

R.M. Rifaat
{"title":"Critical considerations for utility/cogeneration inter tie protection scheme configuration","authors":"R.M. Rifaat","doi":"10.1109/ICPS.1994.303584","DOIUrl":null,"url":null,"abstract":"Special considerations must be given to protection systems for inter ties between cogeneration plants and existing host utility power systems. The considerations are reviewed in light of contemporary experience with mid size cogenerating plants. Typical inter tie configurations are deliberated with emphasis on implications on the design of relevant protection systems. Protection schemes are presented and evaluations to their advantages and disadvantages are given. The importance of examining the protection scheme requirements during the conceptual design stage of a cogenerating plant is demonstrated.<<ETX>>","PeriodicalId":197013,"journal":{"name":"Proceedings of Industrial and Commercial Power Systems Conference","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"33","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Industrial and Commercial Power Systems Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.1994.303584","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 33

Abstract

Special considerations must be given to protection systems for inter ties between cogeneration plants and existing host utility power systems. The considerations are reviewed in light of contemporary experience with mid size cogenerating plants. Typical inter tie configurations are deliberated with emphasis on implications on the design of relevant protection systems. Protection schemes are presented and evaluations to their advantages and disadvantages are given. The importance of examining the protection scheme requirements during the conceptual design stage of a cogenerating plant is demonstrated.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
公用事业/热电联产互连保护方案配置的关键考虑因素
必须特别考虑热电联产厂和现有主公用事业电力系统之间互连的保护系统。根据中型热电联产厂的当代经验,对这些考虑进行了回顾。讨论了典型的互连结构,重点讨论了对相关保护系统设计的影响。提出了保护方案,并对其优缺点进行了评价。论证了在热电联产电厂概念设计阶段审查保护方案要求的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Load modelling in commercial power systems using neural networks Characterization of power quality problems associated with large commercial customers served from large underground distribution network systems Fault analysis of multi-phase unbalanced non-radial power distribution systems Conversion of stand-by-generator facilities to combined heat and power units Electrical power system reliability case studies for water and wastewater treatment facilities
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1