Study on Measures to Improve the PV Hosting Capacity of Tibet Power Grid

Zaihua Li, Haibin Gao, Chao Zheng, Cuomu, S. Lv, Boqi Zhang, Yan Mei, Zhanfeng Chen, Danzengduoji, Hongcheng Zhao
{"title":"Study on Measures to Improve the PV Hosting Capacity of Tibet Power Grid","authors":"Zaihua Li, Haibin Gao, Chao Zheng, Cuomu, S. Lv, Boqi Zhang, Yan Mei, Zhanfeng Chen, Danzengduoji, Hongcheng Zhao","doi":"10.1109/POWERCON.2018.8602011","DOIUrl":null,"url":null,"abstract":"Measures to improve the solar PV hosting capacity of Tibet power grid are studied. The industrial foundation of Tibet autonomous region is less developed, its load level is rather low, the power grid structure is relatively weak, and the power source mainly includes hydropower and photovoltaic, the peak regulating capacity is very limited. Therefore, its PV hosting capacity is inadequate and solar light discard rate is somewhat high (more than 30 percent often). How to improve the PV hosting capacity of Tibet power grid is an urgent problem. The main characteristics of Tibet power grid include: large capacity generator within small power system, strong DC coexists with weak AC, grid structure is rather weak. Most of the power sources in Tibet are hydropower. The proportion of PV installed is large, and the proportion of thermal power is very small and only used for peak load regulation, and they are cold standby generators. The daily peak load in Tibet appears at night, and the yearly maximum load is in winter. Therefore, Tibet power grid needs a lot of incoming power in winter while the solar light discard rate is rather high in summer. In normal operation mode, the PV outputs are limited seriously, but the capability of PV power generation to participate in frequency adjustment, to support the transient stability and voltage stability of the power grid has not been developed. According to the characteristics of Tibet power grid, three measures to improve the PV hosting capacity of Tibet power grid are studied, includes:1)Improving the active power control of the PV power station.2)Realizing globally reactive power optimized coordination control by coordinated control of reactive power compensation equipment.3)Improving the generator-grid coordination performance by changing the related parameter settings. Related control models are built, the simulation calculations results show that the above three kinds of measures can effectively improve the PV hosting capacity of Tibet power grid, the three measures have their application value respectively and can be used in combination.","PeriodicalId":260947,"journal":{"name":"2018 International Conference on Power System Technology (POWERCON)","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Conference on Power System Technology (POWERCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERCON.2018.8602011","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Measures to improve the solar PV hosting capacity of Tibet power grid are studied. The industrial foundation of Tibet autonomous region is less developed, its load level is rather low, the power grid structure is relatively weak, and the power source mainly includes hydropower and photovoltaic, the peak regulating capacity is very limited. Therefore, its PV hosting capacity is inadequate and solar light discard rate is somewhat high (more than 30 percent often). How to improve the PV hosting capacity of Tibet power grid is an urgent problem. The main characteristics of Tibet power grid include: large capacity generator within small power system, strong DC coexists with weak AC, grid structure is rather weak. Most of the power sources in Tibet are hydropower. The proportion of PV installed is large, and the proportion of thermal power is very small and only used for peak load regulation, and they are cold standby generators. The daily peak load in Tibet appears at night, and the yearly maximum load is in winter. Therefore, Tibet power grid needs a lot of incoming power in winter while the solar light discard rate is rather high in summer. In normal operation mode, the PV outputs are limited seriously, but the capability of PV power generation to participate in frequency adjustment, to support the transient stability and voltage stability of the power grid has not been developed. According to the characteristics of Tibet power grid, three measures to improve the PV hosting capacity of Tibet power grid are studied, includes:1)Improving the active power control of the PV power station.2)Realizing globally reactive power optimized coordination control by coordinated control of reactive power compensation equipment.3)Improving the generator-grid coordination performance by changing the related parameter settings. Related control models are built, the simulation calculations results show that the above three kinds of measures can effectively improve the PV hosting capacity of Tibet power grid, the three measures have their application value respectively and can be used in combination.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
提高西藏电网光伏承载能力的措施研究
研究了提高西藏电网太阳能光伏装机容量的措施。西藏自治区工业基础欠发达,负荷水平较低,电网结构相对薄弱,电源以水电和光伏为主,调峰能力十分有限。因此,其光伏发电容量不足,太阳能弃光率有些高(通常超过30%)。如何提高西藏电网的光伏承载能力是一个亟待解决的问题。西藏电网的主要特点是:小电力系统内有大容量发电机,强直流与弱交流并存,电网结构较为薄弱。西藏大部分的电力来源是水力发电。光伏装机占比大,火电占比很小,只用于调峰,属于冷备用发电机。西藏的日负荷高峰出现在夜间,年最大负荷出现在冬季。因此,西藏电网在冬季需要大量的输入电力,而在夏季太阳能弃光率很高。在正常运行模式下,光伏发电出力严重受限,但光伏发电参与调频、支持电网暂态稳定和电压稳定的能力尚未发展起来。根据西藏电网的特点,研究了提高西藏电网PV承载能力的三种措施,包括:1)改进光伏电站的有功控制;2)通过无功补偿设备的协调控制实现全局无功优化协调控制;3)通过改变相关参数设置来改善发电电网的协调性能。建立了相关的控制模型,仿真计算结果表明,上述三种措施均能有效提高西藏电网的光伏承载能力,三种措施各有应用价值,可以组合使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Consistency of damping torque and energy flow dissipation coefficient in oscillation stability analysis Optimization of grid-related protection setting for thermal power units in regional power grid including new energy Research on Analytic Method of Power System Frequency Response Characteristics under Large Power Disturbance A Transmission System Planning Method Considering Fuzzy Model of Load and Interval Model of Renewable Power Analysis of the Impact of Trading Pattern on PV Plant Investment in Spot Market
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1