Single- and multiple-processor models for minimizing completion time variance

Nicholas G. Hall
{"title":"Single- and multiple-processor models for minimizing completion time variance","authors":"Nicholas G. Hall","doi":"10.1002/NAV.3800330105","DOIUrl":null,"url":null,"abstract":"This article concerns the scheduling of n jobs around a common due date, so as to minimize the average total earliness plus total lateness of the jobs. Optimality conditions for the problem are developed, based on its equivalence to an easy scheduling problem. It seems that this problem inherently has a huge number of optimal solutions and an algorithm is developed to find many of them. The model is extended to allow for the availability of multiple parallel processors and an efficient algorithm is developed for that problem. In this more general case also, the algorithm permits great flexibility in finding an optimal schedule.","PeriodicalId":431817,"journal":{"name":"Naval Research Logistics Quarterly","volume":"503 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1986-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"97","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naval Research Logistics Quarterly","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/NAV.3800330105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 97

Abstract

This article concerns the scheduling of n jobs around a common due date, so as to minimize the average total earliness plus total lateness of the jobs. Optimality conditions for the problem are developed, based on its equivalence to an easy scheduling problem. It seems that this problem inherently has a huge number of optimal solutions and an algorithm is developed to find many of them. The model is extended to allow for the availability of multiple parallel processors and an efficient algorithm is developed for that problem. In this more general case also, the algorithm permits great flexibility in finding an optimal schedule.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
单和多处理器模型,以尽量减少完成时间的变化
本文关注的是围绕一个共同的截止日期调度n个作业,以最小化作业的平均总早到和总迟到。基于该问题与简单调度问题的等价性,给出了该问题的最优性条件。似乎这个问题天生就有大量的最优解,并且开发了一种算法来找到其中的许多解。对该模型进行了扩展,以考虑多个并行处理器的可用性,并针对该问题开发了一种有效的算法。在这种更一般的情况下,该算法在寻找最优调度方面具有很大的灵活性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
On estimating population characteristics from record‐breaking observations. i. parametric results Optimal replacement for fault‐tolerant systems Algorithms for the minimax transportation problem Nature of renyi's entropy and associated divergence function Rescheduling to minimize makespan on a changing number of identical processors
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1