Analisis Penjadwalan Produksi Berdasarkan Pesanan Menggunakan Metode Asas Prioritas pada CV Davero Cemerlang Indonesia Surabaya

Moh. Fahrul Faris, Wiwik Handayani
{"title":"Analisis Penjadwalan Produksi Berdasarkan Pesanan Menggunakan Metode Asas Prioritas pada CV Davero Cemerlang Indonesia Surabaya","authors":"Moh. Fahrul Faris, Wiwik Handayani","doi":"10.47467/alkharaj.v4i2.676","DOIUrl":null,"url":null,"abstract":"The purpose of this study was to determine the most efficient order scheduling technique on CV. Davero Jaya Shining Indonesia to reduce delays in order fulfillment. The suggested scheduling approach is based on a priority rule system that includes the following criteria: first come, first served, lowest processing time, longest processing time, and earliest due date (first come first served). Davero Jaya Cemerlang Indonesia uses the SPT technique in its manufacturing process, according to their company CV. The company decided to adopt this technique because it seemed reasonable from a consumer's point of view. The downside of this technique is that it often causes delays in completing client orders. Based on the results of data analysis and debates that have been given, the FCFS technique is the most superior method among others. Considering the fact that the findings of the FCFS method effectiveness measure are consistent with the current criteria, which include minimum average completion scores, maximum utility, minimum average delay, and minimum average labor force in the system. Therefore, the researchers gave suggestions to the company CV. Davero Jaya Cemerlang Indonesia to use the FCFS method as an alternative production scheduling method. With the application of the FCFS method in CV. Davero Jaya Cemerlang Indonesia is expected to be able to help resolve production scheduling problems that have been happening so far. So that the problem of delays in completing orders can be minimized. \nKeywords: Scheduling, Gantt Chart, Priority Principles and CV. Davero Jaya Cemerlang Indonesia","PeriodicalId":286012,"journal":{"name":"Al-Kharaj : Jurnal Ekonomi, Keuangan & Bisnis Syariah","volume":"67 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Al-Kharaj : Jurnal Ekonomi, Keuangan & Bisnis Syariah","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47467/alkharaj.v4i2.676","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of this study was to determine the most efficient order scheduling technique on CV. Davero Jaya Shining Indonesia to reduce delays in order fulfillment. The suggested scheduling approach is based on a priority rule system that includes the following criteria: first come, first served, lowest processing time, longest processing time, and earliest due date (first come first served). Davero Jaya Cemerlang Indonesia uses the SPT technique in its manufacturing process, according to their company CV. The company decided to adopt this technique because it seemed reasonable from a consumer's point of view. The downside of this technique is that it often causes delays in completing client orders. Based on the results of data analysis and debates that have been given, the FCFS technique is the most superior method among others. Considering the fact that the findings of the FCFS method effectiveness measure are consistent with the current criteria, which include minimum average completion scores, maximum utility, minimum average delay, and minimum average labor force in the system. Therefore, the researchers gave suggestions to the company CV. Davero Jaya Cemerlang Indonesia to use the FCFS method as an alternative production scheduling method. With the application of the FCFS method in CV. Davero Jaya Cemerlang Indonesia is expected to be able to help resolve production scheduling problems that have been happening so far. So that the problem of delays in completing orders can be minimized. Keywords: Scheduling, Gantt Chart, Priority Principles and CV. Davero Jaya Cemerlang Indonesia
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
根据订单进行的生产调度分析,使用最聪明的印尼泗水CV Davero的优先级方法进行分析
本研究的目的是确定最有效的订单调度技术的CV。Davero Jaya Shining Indonesia减少订单执行延迟。建议的调度方法基于优先级规则系统,该系统包括以下标准:先到先服务、最短处理时间、最长处理时间和最早到期日(先到先服务)。根据他们公司的简历,Davero Jaya Cemerlang Indonesia在其制造过程中使用了SPT技术。公司决定采用这种技术,因为从消费者的角度来看,这似乎是合理的。这种技术的缺点是它经常导致完成客户订单的延迟。根据数据分析的结果和已经给出的争论,FCFS技术是其他方法中最优越的方法。考虑到FCFS方法有效性度量的结果与现行标准一致,该标准包括系统中最低平均完成分数、最大效用、最低平均延迟和最低平均劳动力。因此,研究者对公司简历提出了建议。印尼Davero Jaya Cemerlang使用FCFS方法作为替代生产调度方法。随着FCFS方法在CV中的应用。预计Davero Jaya Cemerlang Indonesia将能够帮助解决迄今为止一直发生的生产调度问题。这样,延迟完成订单的问题就可以最小化。关键词:调度,甘特图,优先级原则,CV。Davero Jaya Cemerlang印度尼西亚
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Peluang Koperasi Syariah terhadap UMKM pada Masa Pandemi Covid-19 Tantangan Regulasi Keuangan   Bagi Perkembangan Perbankan Islam: Studi Empiris Perkembangan Crowdfunding Syariah di Indonesia The Typology of The Global Financial Crisis and the Solution in Islamic Economic Perspective Pengaruh Promosi, Kualitas Produk dan Harga Terhadap Keputusan Pembelian Konsumen Pada Produk Scarlett Whitening (Studi Kasus Pada Mahasiswi Fakultas Ekonomi dan Bisnis Islam Universitas Islam Negeri Sumatera Utara)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1