Determining the Factors Affecting the Accuracy of Effort Estimates for Different Application and Task Types

Saqib Bukhari, Ali Afzal Malik
{"title":"Determining the Factors Affecting the Accuracy of Effort Estimates for Different Application and Task Types","authors":"Saqib Bukhari, Ali Afzal Malik","doi":"10.1109/FIT.2012.16","DOIUrl":null,"url":null,"abstract":"An important asset in the skill set of any software project manager is the ability to somewhat accurately estimate the effort required to develop a software application. Acquiring this asset, however, requires a thorough understanding of the factors that may affect the accuracy of these estimates. This paper presents the results of an empirical study conducted to determine the causes of variation in the accuracy of effort estimations for different application and task types. A Pakistani software house that specializes in developing financial transaction processing applications is chosen for this empirical study. Actual and estimated values for software development effort are gathered and analyzed for four different types of applications - web-based, database, parallel processing, and telephony - each having six different types of tasks i.e. business-development, new features, usability, security, support, and performance. Over 1000 data points are considered. Analysis of the results reveals, for instance, that the effort for web-based applications is mostly underestimated while the effort for telephony applications is mostly overestimated. The underestimation in web-based applications is usually due to a failure to account for the learning curve associated with rapidly changing web technologies while the overestimation in telephony applications is usually due to a failure to account for the usage of third-party components.","PeriodicalId":166149,"journal":{"name":"2012 10th International Conference on Frontiers of Information Technology","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 10th International Conference on Frontiers of Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FIT.2012.16","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

An important asset in the skill set of any software project manager is the ability to somewhat accurately estimate the effort required to develop a software application. Acquiring this asset, however, requires a thorough understanding of the factors that may affect the accuracy of these estimates. This paper presents the results of an empirical study conducted to determine the causes of variation in the accuracy of effort estimations for different application and task types. A Pakistani software house that specializes in developing financial transaction processing applications is chosen for this empirical study. Actual and estimated values for software development effort are gathered and analyzed for four different types of applications - web-based, database, parallel processing, and telephony - each having six different types of tasks i.e. business-development, new features, usability, security, support, and performance. Over 1000 data points are considered. Analysis of the results reveals, for instance, that the effort for web-based applications is mostly underestimated while the effort for telephony applications is mostly overestimated. The underestimation in web-based applications is usually due to a failure to account for the learning curve associated with rapidly changing web technologies while the overestimation in telephony applications is usually due to a failure to account for the usage of third-party components.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
确定影响不同应用程序和任务类型的工作量估计准确性的因素
在任何软件项目经理的技能集中,一项重要的资产是能够多少准确地估计开发软件应用程序所需的工作量。然而,获取该资产需要对可能影响这些估计准确性的因素有透彻的了解。本文提出了一项实证研究的结果,以确定不同应用程序和任务类型的工作量估计准确性变化的原因。本实证研究选择了一家专门开发金融交易处理应用程序的巴基斯坦软件公司。软件开发工作的实际价值和估计价值被收集并分析为四种不同类型的应用程序——基于web的、数据库的、并行处理的和电话的——每一种都有六种不同类型的任务,即业务开发、新特性、可用性、安全性、支持和性能。考虑超过1000个数据点。例如,对结果的分析表明,网络应用程序的努力大多被低估了,而电话应用程序的努力大多被高估了。基于web的应用程序的低估通常是由于没有考虑到与快速变化的web技术相关的学习曲线,而电话应用程序的高估通常是由于没有考虑到第三方组件的使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Welding Defect Detection and Classification Using Geometric Features Potential Game Convergence of Cognitive Radio Ad Hoc Networks Delay Range Dependent Robust Passification for Singular Neutral Uncertain Systems with Time Varying Delays and Actuator Saturation Muhadith: A Cloud Based Distributed Expert System for Classification of Ahadith A Comparative Analysis of Electrical and Photo Characteristics of LED Lights
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1