Onsite repair of a large gear reducer for a vertical roller mill

Desi A. Delgado
{"title":"Onsite repair of a large gear reducer for a vertical roller mill","authors":"Desi A. Delgado","doi":"10.1109/CITCON.2010.5469774","DOIUrl":null,"url":null,"abstract":"Large gear reducers for vertical roller mills have a lead time of over 2 years. The same can be expected of their spare parts. A catastrophic failure of a gear reducer can be detrimental to a company's production and financial security. This paper discusses the measures taken to bring a vertical roller mill, whose gear reducer was subject to a catastrophic failure, back to 100% production in less than 6 months.","PeriodicalId":250209,"journal":{"name":"2010 IEEE-IAS/PCA 52nd Cement Industry Technical Conference","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE-IAS/PCA 52nd Cement Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.2010.5469774","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Large gear reducers for vertical roller mills have a lead time of over 2 years. The same can be expected of their spare parts. A catastrophic failure of a gear reducer can be detrimental to a company's production and financial security. This paper discusses the measures taken to bring a vertical roller mill, whose gear reducer was subject to a catastrophic failure, back to 100% production in less than 6 months.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
现场维修立式辊磨大型齿轮减速器
大型齿轮减速器的垂直辊轧机有超过2年的交货时间。他们的备用零件也是如此。齿轮减速器的灾难性故障可能对公司的生产和财务安全有害。本文论述了在不到6个月的时间里,使某立式辊磨机因齿轮减速器发生灾难性故障而恢复100%生产的措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Successful retrofit upgrade of a Kiln Drive application at Lehigh Cement, York, Pa by replacing existing electromechanical (D.C.) Drive with Direct Hydraulic Drive system Shifting energy performance in U.S. cement production Considerations in unit substation design to optimize reliability and electrical workplace safety Protection principles for electrical motors in the cement industry Operating the worlds largest kiln line
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1