Project Managers’ Capacity-Planning Practices for Infrastructure Projects in Qatar: A Narrative Literature Review

EM Ojo, D. Halkias, Michael Neubert
{"title":"Project Managers’ Capacity-Planning Practices for Infrastructure Projects in Qatar: A Narrative Literature Review","authors":"EM Ojo, D. Halkias, Michael Neubert","doi":"10.2139/ssrn.3513774","DOIUrl":null,"url":null,"abstract":"Infrastructure project delays and cost overrun are caused by ineffective use of organizational skills, processes, and resources by project managers in the construction industry. Cost overrun and schedule delay in Qatari infrastructure projects have had damaging effects on the national economy by way of claims and litigation, contractual disputes, delays in dependent projects, and project abandonment. This integrated literature review was framed by three conceptual models developed by Gill to outline the capacity management needs within a construction company. Being an extract of a broader qualitative multiple case study on the perceptions of project managers regarding how they utilize capacity-planning practices to mitigate project schedule delay and cost overrun in government-funded infrastructure projects in Qatar, this synthesis evidences the importance of adequate and effective capacity-planning practices to drive infrastructure project success. This overview provides a foundation to support future targeted research while promoting the practice of effective capacity planning. Addressing the capacity planning gap promises timely completion of infrastructure projects and enhanced socio-economic development.","PeriodicalId":102139,"journal":{"name":"Other Topics Engineering Research eJournal","volume":"372 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Other Topics Engineering Research eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3513774","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Infrastructure project delays and cost overrun are caused by ineffective use of organizational skills, processes, and resources by project managers in the construction industry. Cost overrun and schedule delay in Qatari infrastructure projects have had damaging effects on the national economy by way of claims and litigation, contractual disputes, delays in dependent projects, and project abandonment. This integrated literature review was framed by three conceptual models developed by Gill to outline the capacity management needs within a construction company. Being an extract of a broader qualitative multiple case study on the perceptions of project managers regarding how they utilize capacity-planning practices to mitigate project schedule delay and cost overrun in government-funded infrastructure projects in Qatar, this synthesis evidences the importance of adequate and effective capacity-planning practices to drive infrastructure project success. This overview provides a foundation to support future targeted research while promoting the practice of effective capacity planning. Addressing the capacity planning gap promises timely completion of infrastructure projects and enhanced socio-economic development.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
卡塔尔基础设施项目经理的能力规划实践:叙述性文献综述
基础设施项目的延迟和成本超支是由于建筑行业的项目经理对组织技能、流程和资源的无效使用造成的。卡塔尔基础设施项目的成本超支和进度延误,通过索赔和诉讼、合同纠纷、相关项目的延误和项目放弃等方式,对国民经济产生了破坏性影响。这一综合文献综述由Gill开发的三个概念模型构成,以概述建筑公司内的能力管理需求。作为对卡塔尔政府资助的基础设施项目中项目经理如何利用能力规划实践来减轻项目进度延迟和成本超支的看法的更广泛的定性多案例研究的摘录,这一综合证明了充分和有效的能力规划实践对推动基础设施项目成功的重要性。这一概述为支持未来有针对性的研究提供了基础,同时促进了有效容量规划的实践。解决能力规划方面的差距,有助于按时完成基础设施项目,促进社会经济发展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Impact of Information Sharing on Bullwhip Effect in a Non-Serial Supply Chain with Stochastic Lead Time On the Problem of the Specific Frequency of Globular Clusters A Polynomial Least Squares Multiple-Model Estimator: Simple, Optimal, Adaptive, and Practical Predicting and Improving Hydraulic Performance of Pumping Suction Intakes By Computational Fluid Dynamics (CFD) Heptamethine and Nonamethine Cyanine Dyes: Novel Synthetic Strategy, Electronic Transitions, Solvatochromic and Halochromic Evaluation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1