Integration of new generation and load technology in the computation of risk over the operations planning time-horizon

N. Menemenlis, M. Huneault, A. Robitaille
{"title":"Integration of new generation and load technology in the computation of risk over the operations planning time-horizon","authors":"N. Menemenlis, M. Huneault, A. Robitaille","doi":"10.1109/ISGTEUROPE.2010.5638935","DOIUrl":null,"url":null,"abstract":"As new load and generation technologies accompanied by inherent uncertainties are integrated into power systems, utilities should plan to revise their balancing reserves in order to mitigate the consequences of forecast errors. One such technology is wind power generation. To this end, Hydro-Québec has put forward a novel methodology calculating the level of these balancing reserves, over the time horizon of 1–48 hours, based on the risk that the load will exceed the committed generation capacity. The methodology reported in this paper requires as input the statistical characteristics of the load and wind generation forecast errors and of the generation outages, but it is general enough to accommodate other technologies displaying forecast uncertainties The implementation details of this methodology as well a discussion of the nature of the results are given.","PeriodicalId":267185,"journal":{"name":"2010 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT Europe)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2010-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEUROPE.2010.5638935","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

As new load and generation technologies accompanied by inherent uncertainties are integrated into power systems, utilities should plan to revise their balancing reserves in order to mitigate the consequences of forecast errors. One such technology is wind power generation. To this end, Hydro-Québec has put forward a novel methodology calculating the level of these balancing reserves, over the time horizon of 1–48 hours, based on the risk that the load will exceed the committed generation capacity. The methodology reported in this paper requires as input the statistical characteristics of the load and wind generation forecast errors and of the generation outages, but it is general enough to accommodate other technologies displaying forecast uncertainties The implementation details of this methodology as well a discussion of the nature of the results are given.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
新一代发电与负荷技术在运行规划时间范围内风险计算中的集成
由于新的负荷和发电技术伴随着固有的不确定性被整合到电力系统中,公用事业公司应该计划修改其平衡储备,以减轻预测误差的后果。其中一项技术就是风力发电。为此,hydro - qubec提出了一种新的方法,根据负荷超过承诺发电能力的风险,在1-48小时的时间范围内计算这些平衡储备的水平。本文报告的方法需要输入负荷和风力发电预测误差以及发电中断的统计特征,但它足以适应显示预测不确定性的其他技术。给出了该方法的实施细节以及对结果性质的讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
IEEE DEIS and Smart Grid: How to fit in Benchmarking set for domestic smart grid management Smart distribution protection using current-only directional overcurrent relay Operating conditions forecasting for monitoring and control of electric power systems Active distribution network — Demonstration project ADINE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1