Notice of RetractionAn Algorithm of Confirming the Processing Sequence of Complex Multi-product

Xie Zhiqiang, Guo Yukun, Hu Huoyan, Yang Jing, Tang Guangyu
{"title":"Notice of RetractionAn Algorithm of Confirming the Processing Sequence of Complex Multi-product","authors":"Xie Zhiqiang, Guo Yukun, Hu Huoyan, Yang Jing, Tang Guangyu","doi":"10.1109/ICCMS.2009.25","DOIUrl":null,"url":null,"abstract":"Aiming at the problem that the utilization factor is affected by the processing sequence of products while many complex products are processed, a new Job Shop scheduling method is put forward by taking into account to reduce the blank on the machine as much as possible, and to improve the utilization factor. This method confirms the processing sequence of products by calculating the cumulative length of idle time on the machine. The method arranges product with shorter idle time firstly by comparing the cumulative length of idle time which is produced after products are processed. The objective is to short the whole scheduling idle time. The experiment shows that the method proposed can improve the utilization factor and short the total processing time probably.","PeriodicalId":325964,"journal":{"name":"2009 International Conference on Computer Modeling and Simulation","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Computer Modeling and Simulation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCMS.2009.25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Aiming at the problem that the utilization factor is affected by the processing sequence of products while many complex products are processed, a new Job Shop scheduling method is put forward by taking into account to reduce the blank on the machine as much as possible, and to improve the utilization factor. This method confirms the processing sequence of products by calculating the cumulative length of idle time on the machine. The method arranges product with shorter idle time firstly by comparing the cumulative length of idle time which is produced after products are processed. The objective is to short the whole scheduling idle time. The experiment shows that the method proposed can improve the utilization factor and short the total processing time probably.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种确定复杂多积加工顺序的算法
针对大量复杂产品加工过程中产品加工顺序影响加工利用率的问题,提出了一种考虑到尽可能减少机床毛坯,提高加工利用率的作业车间调度新方法。该方法通过计算机床闲置时间的累计长度来确定产品的加工顺序。该方法首先通过比较产品加工后产生的闲置时间的累计长度来安排闲置时间较短的产品。目标是缩短整个调度空闲时间。实验表明,该方法可以提高利用率,缩短总处理时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Sample of Stochastic Simulation of an Automatic Teller Machine Multiresolution Animated Models Generation Based on Deformation Distance Analysis Study on Technique of 3D Imaging-Based DEM and Massive Orthograph Airspace Capacity Management Based on Control Workload and Coupling Constraints between Airspaces Self-adaptive Wheel-side Independent Driving System with Active Suspension
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1