Optimization under Uncertainty for Reliable Unconventional Play Evaluation. A Case Study in Vaca Muerta Shale Gas Blocks, Argentina

R. Mehranfar, L. Marquez, R. Altman, Hassan Kolivand, Rodrigo Orantes, O. Espinola
{"title":"Optimization under Uncertainty for Reliable Unconventional Play Evaluation. A Case Study in Vaca Muerta Shale Gas Blocks, Argentina","authors":"R. Mehranfar, L. Marquez, R. Altman, Hassan Kolivand, Rodrigo Orantes, O. Espinola","doi":"10.2118/191272-MS","DOIUrl":null,"url":null,"abstract":"\n The objective of this work is to present a comprehensive workflow to optimize the value of a hydrocarbon asset evaluation project under high degrees of uncertainty. This workflow is applicable to both conventional and unconventional assets. However, because of the considerable level of subsurface uncertainty and high initial costs (mainly due to drilling and hydraulic fracturing operations), unconventional resources are good examples for demonstrating the benefits of the workflow. For the case of an unconventional asset, well spacing and perforation cluster spacing are usually the decision parameters that need to be optimized to increase its value.\n The workflow begins with the construction of a representative base case single well gas simulation model for production history matching. Petrophysical, geological, geomechanical, stimulation, completions and production data are interpreted and analyzed together to better understand drivers that could be influencing the production. If this can be repeated with several wells in the block with sufficient production data, the process is enriched as so the level of confidence, as the range of history-matching parameters from these different wells across the block can be captured for sensitivity and uncertainty analysis. Several sets of sensitivities and uncertainty runs are then performed to get a probabilistic production profile in the presence of the most influential parameters. It is important to highlight that usually, the limited number of wells, short production histories, different dynamic behavior in neighboring blocks and the lack of necessary data to help understand well performance all contribute to the high uncertainty in predicting production.\n Given the high cost of drilling and hydraulic fracturing and on the other hand the high gas price in Argentina, optimizing well spacing and cluster spacing are critical parameters in the process of unconventional resource evaluation considering the high degree of uncertainty.","PeriodicalId":415543,"journal":{"name":"Day 2 Tue, June 26, 2018","volume":"111 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, June 26, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191272-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The objective of this work is to present a comprehensive workflow to optimize the value of a hydrocarbon asset evaluation project under high degrees of uncertainty. This workflow is applicable to both conventional and unconventional assets. However, because of the considerable level of subsurface uncertainty and high initial costs (mainly due to drilling and hydraulic fracturing operations), unconventional resources are good examples for demonstrating the benefits of the workflow. For the case of an unconventional asset, well spacing and perforation cluster spacing are usually the decision parameters that need to be optimized to increase its value. The workflow begins with the construction of a representative base case single well gas simulation model for production history matching. Petrophysical, geological, geomechanical, stimulation, completions and production data are interpreted and analyzed together to better understand drivers that could be influencing the production. If this can be repeated with several wells in the block with sufficient production data, the process is enriched as so the level of confidence, as the range of history-matching parameters from these different wells across the block can be captured for sensitivity and uncertainty analysis. Several sets of sensitivities and uncertainty runs are then performed to get a probabilistic production profile in the presence of the most influential parameters. It is important to highlight that usually, the limited number of wells, short production histories, different dynamic behavior in neighboring blocks and the lack of necessary data to help understand well performance all contribute to the high uncertainty in predicting production. Given the high cost of drilling and hydraulic fracturing and on the other hand the high gas price in Argentina, optimizing well spacing and cluster spacing are critical parameters in the process of unconventional resource evaluation considering the high degree of uncertainty.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
不确定条件下非常规储层可靠评价优化。阿根廷Vaca Muerta页岩气区块案例研究
这项工作的目的是提出一个全面的工作流程,以优化高度不确定性下的油气资产评估项目的价值。该工作流程适用于常规和非常规资产。然而,由于地下的不确定性和高昂的初始成本(主要是由于钻井和水力压裂作业),非常规资源是展示该工作流程优势的一个很好的例子。对于非常规资产,井距和射孔簇间距通常是需要优化的决策参数,以增加其价值。该工作流程从建立具有代表性的基本情况单井气体模拟模型开始,用于生产历史匹配。对岩石物理、地质、地质力学、增产、完井和生产数据进行综合解释和分析,以更好地了解可能影响生产的驱动因素。如果可以在区块内的几口井中重复使用,并获得足够的生产数据,那么该过程的可信度就会提高,因为可以捕获区块内不同井的历史匹配参数范围,以进行灵敏度和不确定性分析。然后进行几组敏感性和不确定性运行,以在最具影响力的参数存在的情况下获得概率生产剖面。需要强调的是,通常情况下,井数量有限、生产历史较短、邻近区块的动态行为不同以及缺乏必要的数据来帮助了解井的动态,这些都导致了产量预测的高度不确定性。鉴于阿根廷钻井和水力压裂成本高,另一方面天然气价格高,考虑到高度的不确定性,优化井距和簇距是非常规资源评价过程中的关键参数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Optimization under Uncertainty for Reliable Unconventional Play Evaluation. A Case Study in Vaca Muerta Shale Gas Blocks, Argentina Stability Improvement of CO2 Foam for Enhanced Oil Recovery Applications Using Nanoparticles and Viscoelastic Surfactants Effect of Temperature, Phase Change, and Chemical Additive on Wettability Alteration During Steam Applications in Sands and Carbonates Application of the Capacitance Model in Primary Production Period before IOR Implementation Transient and Boundary Dominated Flow Temperature Analysis under Variable Rate Conditions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1