{"title":"Field Reliability of D.C. Power Plants for Telecommunication Systems","authors":"M. Grossoni, L. Rizzi","doi":"10.1109/INTLEC.1987.4794636","DOIUrl":null,"url":null,"abstract":"Field reliability data are described with references to 48V/60V 300A power plants, developed by ITALTEL according to specifications of SIP, Italian Telecommunication Operating Company. Each power plant consists of a power distribution system, 60A rectifiers and 25A buck-boost converters, redundant parallel operating with load sharing and selective cut-off of failed unit. The period under examination covers almost 4 years, during which over 200 power plants with more than 600 rectifiers and 700 buck-boost converters have been installed. The methods used for data collection are explained, as well as the statistical instruments used for the comparison of field results and estimated data.","PeriodicalId":129305,"journal":{"name":"INTELEC '87 - The Ninth International Telecommunications Energy Conference","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1987-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTELEC '87 - The Ninth International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1987.4794636","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Field reliability data are described with references to 48V/60V 300A power plants, developed by ITALTEL according to specifications of SIP, Italian Telecommunication Operating Company. Each power plant consists of a power distribution system, 60A rectifiers and 25A buck-boost converters, redundant parallel operating with load sharing and selective cut-off of failed unit. The period under examination covers almost 4 years, during which over 200 power plants with more than 600 rectifiers and 700 buck-boost converters have been installed. The methods used for data collection are explained, as well as the statistical instruments used for the comparison of field results and estimated data.