Optimal location and sizing of solar farm on Japan east power system using multiobjective Bees algorithm

Prakornchai Phonrattanasak, M. Miyatake, O. Sakamoto
{"title":"Optimal location and sizing of solar farm on Japan east power system using multiobjective Bees algorithm","authors":"Prakornchai Phonrattanasak, M. Miyatake, O. Sakamoto","doi":"10.1109/ENERGYTECH.2013.6645334","DOIUrl":null,"url":null,"abstract":"Nowadays some nuclear power plant in Japan is shut down due to problem of security in earthquake disaster. Consequently, Japan will encounter a lack of electrical energy in the future if new electrical generation is not constructed. Solar energy is one of appropriate renewable energy for Japan. Solar panel produces electrical energy by using the natural solar radiation from sun. PV Solar farm consists of multiple components, including the photovoltaic modules, mechanical and electrical connections. PV solar farm with grid-connected can directly connect to the existing electricity grid by using inverter circuit toward transformer. In this paper, PV solar farm is utilized as a power generation which injects active power into a Japan east power system. An optimal location and sizing of solar farm by using multiobjective Bees optimization (MBO) is proposed to minimize fuel and emission costs of overall system with considering solar radiation energy in each area. The results show that the proposed method found the optimal position of solar farm with minimum cost of fuel and environmental pollution.","PeriodicalId":154402,"journal":{"name":"2013 IEEE Energytech","volume":"105 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE Energytech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGYTECH.2013.6645334","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

Abstract

Nowadays some nuclear power plant in Japan is shut down due to problem of security in earthquake disaster. Consequently, Japan will encounter a lack of electrical energy in the future if new electrical generation is not constructed. Solar energy is one of appropriate renewable energy for Japan. Solar panel produces electrical energy by using the natural solar radiation from sun. PV Solar farm consists of multiple components, including the photovoltaic modules, mechanical and electrical connections. PV solar farm with grid-connected can directly connect to the existing electricity grid by using inverter circuit toward transformer. In this paper, PV solar farm is utilized as a power generation which injects active power into a Japan east power system. An optimal location and sizing of solar farm by using multiobjective Bees optimization (MBO) is proposed to minimize fuel and emission costs of overall system with considering solar radiation energy in each area. The results show that the proposed method found the optimal position of solar farm with minimum cost of fuel and environmental pollution.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用多目标蜜蜂算法优化日本东部电力系统太阳能发电场的位置和规模
目前,日本的一些核电站由于地震灾害中的安全问题而关闭。因此,如果不建设新的发电厂,日本未来将面临电力短缺的问题。太阳能是适合日本的可再生能源之一。太阳能电池板利用太阳的自然辐射产生电能。光伏太阳能电站由多个组件组成,包括光伏模块、机械和电气连接。并网光伏太阳能发电场通过对变压器采用逆变电路直接接入现有电网。本文以光伏太阳能发电场为发电机组,向日本东部电力系统注入有功电力。在考虑各个区域太阳辐射能的情况下,利用多目标蜜蜂优化(MBO)方法对太阳能发电场的选址和规模进行优化,使整个系统的燃料和排放成本最小。结果表明,所提出的方法找到了燃料成本最小、环境污染最小的太阳能发电场的最佳位置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Energy exchange model of PV-based battery switch stations based on battery swap service and power distribution Flux weakening control for surface mount permanent magnet synchronous motor (PMSM) drives with rapid load and speed varying applications Toward an Energy-Proportional Building prospect: Evaluation and analysis of the energy consumption in a green building testbed Commercialization of high 600V GaN-on-silicon power HEMTs and diodes On time desynchronization attack against IEEE 1588 protocol in power grid systems
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1