Radical breakthrough innovative solution in SHBI PM optimization using TRIZ

N. Annamalai, Narendra Kumar Patel, Subramaniam Muthukarapan
{"title":"Radical breakthrough innovative solution in SHBI PM optimization using TRIZ","authors":"N. Annamalai, Narendra Kumar Patel, Subramaniam Muthukarapan","doi":"10.1109/IEMT.2008.5507884","DOIUrl":null,"url":null,"abstract":"Preventive maintenance (PM) is a crucial activity to ensure the stability and performance of a tool. It has lead to long hour and tedious activity on SHBI (Self Heat Burn-In). SHBI is a tool used to support the Burn-In process. SHBI carries several long hour PM task which also requires some conversion activities. This has been leading to a total >15% weekly capacity loss. This paper will discuss on how both the unproductive long hour activities have been analyzed through theory of innovative problem solving (TRIZ) methodology.","PeriodicalId":151085,"journal":{"name":"2008 33rd IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 33rd IEEE/CPMT International Electronics Manufacturing Technology Conference (IEMT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.2008.5507884","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Preventive maintenance (PM) is a crucial activity to ensure the stability and performance of a tool. It has lead to long hour and tedious activity on SHBI (Self Heat Burn-In). SHBI is a tool used to support the Burn-In process. SHBI carries several long hour PM task which also requires some conversion activities. This has been leading to a total >15% weekly capacity loss. This paper will discuss on how both the unproductive long hour activities have been analyzed through theory of innovative problem solving (TRIZ) methodology.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
使用TRIZ进行SHBI PM优化的突破性创新解决方案
预防性维护(PM)是确保工具稳定性和性能的一项重要活动。这导致了在SHBI(自热老化)上长时间和繁琐的活动。SHBI是一个用于支持Burn-In过程的工具。SHBI承担了几个长时间的PM任务,这也需要一些转换活动。这导致每周总容量损失超过15%。本文将讨论如何通过创新问题解决理论(TRIZ)方法来分析这两种非生产性长时间活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Process development and reliability evaluation of Electrically conductive adhesives (ECA) for low temperature SMT assembly Lead-free solder ball attach improvement on FCPBGA with SOP pad finishing High efficiency 850 nm Vertical-Cavity Surface-Emitting Laser using fan-pad metallization and trench patterning A comparison study on SnAgNiCo and Sn3.8Ag0.7Cu C5 lead free solder system Pressure sensors based on MEMS, operating in harsh environments (touch-mode)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1