Efectiveness Comparison of Overtime Hours with Technical and Economical Employment on 10165 Ton Gwt Tanker Ship Repairation

Bimantara Panji Saputra, F. Ardhiansyah, Soffiana Agustin
{"title":"Efectiveness Comparison of Overtime Hours with Technical and Economical Employment on 10165 Ton Gwt Tanker Ship Repairation","authors":"Bimantara Panji Saputra, F. Ardhiansyah, Soffiana Agustin","doi":"10.30587/ivrj.v2i1.5074","DOIUrl":null,"url":null,"abstract":"Aspects of ship repair planning must be considered, especially during the ship repair process. This component is closely related to what is needed by professionals in specific fields. Project completion time can also be estimated using the number of workers involved in the production process. The salary paid by the company also correlates with the number of employees. One of the techniques to speed up work on a tanker repair project by increasing working hours which is often referred to as overtime hours with two approaches to speeding up work on a project evaluated technically and economically compared by researchers. Researchers evaluate project work and calculate the workforce involved in tanker repair. Researchers perform calculations for each part of the workforce in the ship repairment process, and also analyze the scheduling of each part of the workers that have been prepared by the company. Working on the project experienced a shortage of manpower and more often used the overtime system. and it can be seen from the results of the study that adding labor is more efficient from an economic point of view because the costs incurred are less and the processing time does not exceed the specified duration. \n  \nKeywords: Tanker Ships; Labor; Duration; Cost","PeriodicalId":186363,"journal":{"name":"Indonesian Vocational Research Journal","volume":"109 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Vocational Research Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30587/ivrj.v2i1.5074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Aspects of ship repair planning must be considered, especially during the ship repair process. This component is closely related to what is needed by professionals in specific fields. Project completion time can also be estimated using the number of workers involved in the production process. The salary paid by the company also correlates with the number of employees. One of the techniques to speed up work on a tanker repair project by increasing working hours which is often referred to as overtime hours with two approaches to speeding up work on a project evaluated technically and economically compared by researchers. Researchers evaluate project work and calculate the workforce involved in tanker repair. Researchers perform calculations for each part of the workforce in the ship repairment process, and also analyze the scheduling of each part of the workers that have been prepared by the company. Working on the project experienced a shortage of manpower and more often used the overtime system. and it can be seen from the results of the study that adding labor is more efficient from an economic point of view because the costs incurred are less and the processing time does not exceed the specified duration.   Keywords: Tanker Ships; Labor; Duration; Cost
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
10165吨Gwt油轮修船加班时间与技术经济用工效果比较
船舶修理计划的各个方面必须考虑,特别是在船舶修理过程中。该组件与特定领域的专业人员所需要的内容密切相关。项目完成时间也可以用参与生产过程的工人数量来估计。公司支付的工资也与员工人数有关。通过增加工作时间(通常被称为加班时间)来加快油轮维修项目的工作速度的技术之一,研究人员对两种加速项目工作的方法进行了技术和经济评估。研究人员评估项目工作并计算油轮维修所涉及的劳动力。研究人员对船舶维修过程中每个部分的劳动力进行计算,并分析公司已经准备好的每个部分的工人调度。在项目中经历了人力短缺,更经常使用加班制度。从研究结果可以看出,从经济角度来看,增加劳动力的效率更高,因为所产生的成本更少,加工时间不超过规定的持续时间。关键词:油轮;劳动;持续时间;成本
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Influence of Service Quality, Price, and Convenience on Purchase Decisions of Gofood Services (Study on University of Muhammadiyah Gresik Students) The Effect of Work Motivation, Compensation, and Work Discipline on Employee Performance at PT Darma Panca Samudera Application of Lean Manufacturing to Minimize Waste in the Lajiem Coffee Business Production Process Design of Water PH Quality Monitoring System in PT SIER Industrial Area Based on Internet of Things at Waste Water Treatment Plant Implementation of PLC Outseal as a Controller of Ammonia Gas Circulation in Chicken Coops with HMI Modbus Monitoring
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1