Improving Design Coordination With Lean and BIM, an Indian Case Study

Vaibhav Bhat, Jyoti Trivedi, Bhargav Dave
{"title":"Improving Design Coordination With Lean and BIM, an Indian Case Study","authors":"Vaibhav Bhat, Jyoti Trivedi, Bhargav Dave","doi":"10.24928/2018/0479","DOIUrl":null,"url":null,"abstract":"Building Information Modeling (BIM) and Lean construction principles have been used independently as significant methods to construction process improvement. Their combination presents challenges and opportunities in implementation, especially when applied in the field. This study explores two perspectives, firstly identifying factors and issues in design coordination of construction projects; secondly, applying lean and BIM functions simultaneously to overcome some of the problems in design coordination. Relative Importance Index (RII) method was adopted to identify major critical factors of design coordination and their effect on the three categories viz; design management, time management and cost management. Subsequently, BIM and lean functions such as 4D simulation integrated with Look ahead planning, Quantity take off, Clash detection during look-ahead and weekly work planning, to reduce change orders and RFIs for additional value to customer were applied in an integrated fashion. This improvised BIMLean process facilitates the design co-ordination during construction phase for all project stakeholders. Finally a matrix is drafted based on previous research that shows integration of Lean Principles and BIM functionalities adopted for the case study.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"123 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0479","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Building Information Modeling (BIM) and Lean construction principles have been used independently as significant methods to construction process improvement. Their combination presents challenges and opportunities in implementation, especially when applied in the field. This study explores two perspectives, firstly identifying factors and issues in design coordination of construction projects; secondly, applying lean and BIM functions simultaneously to overcome some of the problems in design coordination. Relative Importance Index (RII) method was adopted to identify major critical factors of design coordination and their effect on the three categories viz; design management, time management and cost management. Subsequently, BIM and lean functions such as 4D simulation integrated with Look ahead planning, Quantity take off, Clash detection during look-ahead and weekly work planning, to reduce change orders and RFIs for additional value to customer were applied in an integrated fashion. This improvised BIMLean process facilitates the design co-ordination during construction phase for all project stakeholders. Finally a matrix is drafted based on previous research that shows integration of Lean Principles and BIM functionalities adopted for the case study.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用精益和BIM改进设计协调,一个印度案例研究
建筑信息模型(BIM)和精益施工原则已经分别作为施工过程改进的重要方法。它们的结合在执行方面带来了挑战和机遇,特别是在实地应用时。本研究从两个角度进行探讨,一是找出建设项目设计协调中的因素与问题;其次,同时运用精益和BIM的功能,克服设计协调中的一些问题。采用相对重要性指数法(Relative Importance Index, RII)识别设计协调的主要关键因素及其对三类设计协调的影响;设计管理、时间管理和成本管理。随后,BIM和精益功能,如与预检计划集成的4D模拟,数量起飞,预检期间的冲突检测和每周工作计划,以集成的方式应用于减少变更订单和rfi,为客户带来附加价值。这种即兴的BIMLean流程促进了所有项目利益相关者在施工阶段的设计协调。最后,根据先前的研究起草了一个矩阵,该矩阵显示了案例研究中采用的精益原则和BIM功能的集成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Enhancing Labour Productivity in Petrochemical Construction and Maintenance Projects Complex Production Systems: Non-Linear and Non-Repetitive Projects Towards Facility Management Participation in Design: A UCSF Case Study Project Delivery Through Lean Principles Across All Disciplnes of Construction in a Developing Country Environment Short Takt Time in Construction – a Practical Study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1