{"title":"ENERGY PLANT OPERATION AND INSTALLATION PLANNING VIA STOCHASTIC PROGRAMMING","authors":"Tomoki Fukuba, T. Shiina, K. Tokoro","doi":"10.15807/torsj.63.1","DOIUrl":null,"url":null,"abstract":"An optimization model of energy plants operational planning when installing photovoltaic generation and a storage battery is developed via two-stage stochastic programming. This determines the operational planning while considering the uncertainty of the output of the photovoltaic generation. The uncertainty is represented by a set of discrete scenarios. The decisions indicating the states of the devices are made in the (cid:12)rst stage, and the amounts of the energy (cid:13)ow are determined in the second stage for each scenario. The objective is the minimization of the expected value of the operational cost. Including a nonlinear constraint for a practical operational planning, the model becomes a large-scale nonlinear mixed integer programming problem. In order to obtain an exact solution, we reformulate it as a large-scale mixed integer programming problem by introducing piecewise linear approximation. Computational results show the effectiveness of our stochastic model by comparing it with the conventional deterministic model. We also calculate recovery periods of the investment cost for the photovoltaic generation and the storage battery and make an economical evaluation of installing them in Japan.","PeriodicalId":309425,"journal":{"name":"Transactions of the Operations Research Society of Japan","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions of the Operations Research Society of Japan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15807/torsj.63.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

An optimization model of energy plants operational planning when installing photovoltaic generation and a storage battery is developed via two-stage stochastic programming. This determines the operational planning while considering the uncertainty of the output of the photovoltaic generation. The uncertainty is represented by a set of discrete scenarios. The decisions indicating the states of the devices are made in the (cid:12)rst stage, and the amounts of the energy (cid:13)ow are determined in the second stage for each scenario. The objective is the minimization of the expected value of the operational cost. Including a nonlinear constraint for a practical operational planning, the model becomes a large-scale nonlinear mixed integer programming problem. In order to obtain an exact solution, we reformulate it as a large-scale mixed integer programming problem by introducing piecewise linear approximation. Computational results show the effectiveness of our stochastic model by comparing it with the conventional deterministic model. We also calculate recovery periods of the investment cost for the photovoltaic generation and the storage battery and make an economical evaluation of installing them in Japan.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
通过随机规划进行电厂运行和安装规划
采用两阶段随机规划的方法,建立了光伏发电和蓄电池并网时电厂运行规划的优化模型。这决定了在考虑光伏发电输出不确定性的情况下进行运行规划。不确定性由一组离散情景表示。指示设备状态的决定是在第一个阶段(cid:12)中做出的,并且在第二个阶段确定每个场景的能量(cid:13)量。目标是使运营成本的期望值最小化。该模型包含一个实际操作规划的非线性约束,成为一个大规模的非线性混合整数规划问题。为了得到精确解,我们引入分段线性逼近,将其重新表述为一个大规模混合整数规划问题。通过与传统的确定性模型的比较,计算结果表明了随机模型的有效性。计算了光伏发电和蓄电池的投资成本回收期,并对在日本安装光伏发电和蓄电池进行了经济性评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
APPROPRIATE ALLOCATIONS AND LOCATIONS ANALYSIS OF INCINERATION FACILITIES BY MULTI-OBJECTIVE OPTIMIZATION USING VORONOI DIAGRAM AND GENETIC ALGORITHM: A CASE STUDY OF THE NORTHWESTERN BAY AREA IN CHIBA PREFECTURE A SEARCH ALLOCATION GAME WITH AN INTERDICTOR FORECAST OF THE NUMBER OF WORKERS IN THE ACCOMMODATION AND FOOD SERVICES INDUSTRY CONTRIBUTING TO EBPM OF COVID-19 APPROXIMATE ANALYTICAL SOLUTION TO CONSUMPTION AND LONG-TERM SECURITY INVESTMENT OPTIMIZATION PROBLEM WITH EPSTEIN-ZIN UTILITY EFFECTS OF INEQUITY AVERSION ON THE DYNAMICS OF COORDINATION GAMES
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1