Forecasting the Effects of the Claims in the Korean Construction Industry

Jihye Kim, Haekyung Im, Jaehyun Choi
{"title":"Forecasting the Effects of the Claims in the Korean Construction Industry","authors":"Jihye Kim, Haekyung Im, Jaehyun Choi","doi":"10.6106/KJCEM.2016.17.5.035","DOIUrl":null,"url":null,"abstract":": Various risk factors are known to be the nature of construction project execution process. These factors lead to potential claims, dispute mediation, arbitration, and litigation which can result in huge loss of money and time. Therefore, it is necessary for construction companies in Korea to improve overall project management capability through the evaluation before entering into the overseas construction market. Also, after examination of the claim and dispute caused by construction project risks, a substantial degree of influence and active preparation for the claim and dispute management should be confirmed via the effect analysis of the each factors. Main claim causes were derived through claim and dispute cases involved with domestic construction projects. As a prediction result of the main claim, 16.1% of the construction change claim, 5.7% of the bad faith claim and 2.7% for the construction delay claim were found to be the portion of the total construction cost. As a result of this analysis, risk management methodology was suggested to improve a project management capability for domestic construction companies through analysis result of the main factors of construction claims.","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"103 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.5.035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

: Various risk factors are known to be the nature of construction project execution process. These factors lead to potential claims, dispute mediation, arbitration, and litigation which can result in huge loss of money and time. Therefore, it is necessary for construction companies in Korea to improve overall project management capability through the evaluation before entering into the overseas construction market. Also, after examination of the claim and dispute caused by construction project risks, a substantial degree of influence and active preparation for the claim and dispute management should be confirmed via the effect analysis of the each factors. Main claim causes were derived through claim and dispute cases involved with domestic construction projects. As a prediction result of the main claim, 16.1% of the construction change claim, 5.7% of the bad faith claim and 2.7% for the construction delay claim were found to be the portion of the total construction cost. As a result of this analysis, risk management methodology was suggested to improve a project management capability for domestic construction companies through analysis result of the main factors of construction claims.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
预测韩国建设行业的索赔影响
各种风险因素是已知的建设项目执行过程的本质。这些因素会导致潜在的索赔、纠纷调解、仲裁和诉讼,从而造成巨大的金钱和时间损失。因此,国内建设企业在进入海外建设市场之前,有必要通过评估来提高整体项目管理能力。此外,在对建设项目风险引起的索赔和争议进行审查后,通过对各因素的影响分析,确定对索赔和争议管理的实质性影响程度和积极准备。主要索赔事由是通过涉及国内建设项目的索赔和纠纷案件得出的。根据主索赔预测结果,工程变更索赔占总造价的16.1%,恶意索赔占5.7%,施工延误索赔占2.7%。在此基础上,通过对工程索赔主要因素的分析,提出了风险管理方法,以提高国内建筑公司的项目管理能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
BIM 기술 융·복합 수준 분석을 위한 특허 정보 활용 방안 Analysis of Leasing Decision Determinants by the Store Size and Lend-Lease Perspectives for Mix-Used Shopping Mall Development Seamless Superimposition Technique of Virtual Objects for AR System of Excavator Based on Image Processing Review of Real Options Analysis for Renewable Energy Projects Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1